Flushing method recommendations
Operational concept – Step 3 and 4
In step 3, the location for the chosen surge flushing device is specified. The location should preferably be immediately in front of the sewer section that is exposed to deposits, and allows for an easy access. Furthermore, depending on the function of the surge flushing device, it is important to ensure the availability of electrical and data services.
In step 4, the investment and operational costs for all surge flushing devices worth considering are determined and compared. In the process, possible cost advantages owing to parallel applications (e.g. management measures) must be taken into account.