NA-06 - Cleaning: Design Measures to Avoid Deposits

NA-06 - Cleaning: Design Measures to Avoid Deposits

Constructive design measures for the reduction of deposits

The possibility to reduce or even avoid the formation of deposits within the sewer system can be achieved through the implementation of constructive design measures used in the following scenarios:

  • Semi-central sedimentation

  • Decentralised retention of solids

/ 24