NA-05 - Cleaning: Cleaning Strategy and Programme

Table of contents

Determination of cleaning intervals

Acceptance protocol (2)

The acceptance protocol should contain:

  • Place, date and time of the performed services

  • Name of contractor, name of on-site inspector

  • Assessment of the sewer line condition before cleaning

  • The cleaning method and equipment used

  • Type and amount of removed waste material. Estimation of the structural and hydraulic state of the sewer line after cleaning

Table: 
Example for an acceptance protocol of a sewer cleaning modelled after [EN14654-1] (amended)
Location Start
MH
End
MH
Section
length
Nominal
size
Sewer
type
Cleaning
method
Deposit
level
Sewer
condition
Cleaning
duration
Notes and
comments
... ... ... ... ... ... ... ... ... ... ...
 

 