Determination of cleaning intervals
Acceptance protocol (2)
The acceptance protocol should contain:
-
Place, date and time of the performed services
-
Name of contractor, name of on-site inspector
-
Assessment of the sewer line condition before cleaning
-
The cleaning method and equipment used
-
Type and amount of removed waste material. Estimation of the structural and hydraulic state of the sewer line after cleaning
Location | Start MH |
End MH |
Section length |
Nominal size |
Sewer type |
Cleaning method |
Deposit level |
Sewer condition |
Cleaning duration |
Notes and comments |
---|---|---|---|---|---|---|---|---|---|---|
... | ... | ... | ... | ... | ... | ... | ... | ... | ... | ... |