Pipe failures and damage areas pose a direct threat to the stability of the channel, and are the starting points for larger problems such as channel collapses or cave ins. Given these far reaching implications, damaged sewers located within or bellow the ground water level are usually placed under the immediate or short term rehabilitation plan. Rehabilitation, according to [[ATVA128]] necessary when extraneous water infiltration surpasses 0,15 l/s ∙ ha.