Documentations
17 Documentations available
| Area | Title | Author | Illustration | Date | Partner |
|---|---|---|---|---|---|
|
Spirally-wound pipe lining with self-propelled winding machine
Renovation of a concrete sewer DN 1200 by lining with site-manufactured pipes by means of a self-propelled winding machine (RotaLoc)
|
Prof. Dr.-Ing. Stein & Partner GmbH |
|
2008 |
|
|
Lateral connection repair
Recovery of lateral connections DN 150 of a sewer DN 250 that was rehabilitated by CIPP using the DrainLCR system
|
Prof. Dr.-Ing. Stein & Partner GmbH |
|
2008 |
|
|
Grouted-in-place lining process
Renovation of an ovoid cross section DN 2250/1800 by the TROLINING®-double system without Preliner.Task promoted by MUNLV NRW
|
Prof. Dr.-Ing. Stein & Partner GmbH |
|
2007 | |
|
Modernization of small sewage treatment plant
Modernization of a three-chamber dry well using the open-cut method by means of the new installation of an SBR-unit
|
Prof. Dr.-Ing. Stein & Partner GmbH |
|
2006 | |
|
Static pipe bursting
Replacement of a vitrified clay sewer DN 300 and DN 400 by static pipe bursting with PE-HD pipes OD 450 and OD 500
|
Prof. Dr.-Ing. Stein & Partner GmbH |
|
2005 | |
|
Grouted-in-place lining process for potable water pipelines
Renovation of a potable water pipeline DN 100 with the Cempipe process
|
Prof. Dr.-Ing. Stein & Partner GmbH |
|
2005 | |
|
Discrete pipe process
Renovation of a ovoid brickwork cross section DN 600/900 with the GRP discrete pipe process
|
Prof. Dr.-Ing. Stein & Partner GmbH |
|
2005 | |
|
Joint rehabilitation and crack injection
Repair of masonry sewage collectors and manholes while retaining the original masonry by rehabilitation of the joints and crack injection
|
Prof. Dr.-Ing. Stein & Partner GmbH |
|
2004 | |
|
Manhole top rehabilitation and releveling
Replacement of a defective manhole top and repair of the surrounding road surface
|
Prof. Dr.-Ing. Stein & Partner GmbH |
|
2004 | |
|
Manhole restoration by means of manhole frame remover
Manhole restoration by means of manhole frame remover
|
Prof. Dr.-Ing. Stein & Partner GmbH |
|
2004 | |
|
Cured-in-place process
Renovation of a vitrified clay sewer DN 250 to DN 350 with the KM-Inliner method
|
Prof. Dr.-Ing. Stein & Partner GmbH |
|
2004 | |
|
Repair with stainless steel sleeves
Repair of HD-PE drain pipe of nominal sizes DN 150 to DN 350 with the stainless steel 'Stuttgarter Sleeve'
|
Prof. Dr.-Ing. Stein & Partner GmbH |
|
2004 | |
|
Cured-in-place process
Renovation of a surface water sewer DN 300 by the Inpipe process
|
Prof. Dr.-Ing. Stein & Partner GmbH |
|
2004 | |
|
Cured-in-place process
Renovation of a vitrified clay sewer nominal size DN 200 by the DS CityLiner process
|
Prof. Dr.-Ing. Stein & Partner GmbH |
|
2004 | |
|
Fill and drain system (Flood grouting)
Repair of a sewer DN 150 by the Sanipor fill and drain system (flood grouting)
|
Prof. Dr.-Ing. Stein & Partner GmbH |
|
2004 | |
|
Invert segmental lining with vitrified clay elements
Renovation of a circular cross section DN 1200 by partial lining with KeraLine elements
|
Prof. Dr.-Ing. Stein & Partner GmbH |
|
2003 | |
|
Grouted-in-place lining process
Renovation of an ovoid cross section DN 1000/1500 by the TROLINING® preliner system
|
Prof. Dr.-Ing. Stein & Partner GmbH |
|
2003 |