HDD tooling that gets the job done
Apr 22, 2024
Horizontal directional drilling is a dynamic process that constantly changes and adapts to suit a range of applications across utilities and infrastructure. Operators looking to get the most from their equipment need to partner with suppliers that offer the best.
Selecting the right horizontal directional drilling (HDD) tooling is a critical step in the HDD process, with incorrect choices costing valuable time and increasing the likelihood of errors and project delays. From drill rods and connection options, to housing, vise jaws and rod wipers – contractors that want to secure the best results for their projects ensure they employ the best equipment on the market. Jobs change and sometimes the unexpected happens. At such times, contractors need tooling to help them adapt immediately.
The latest in HDD tooling
In line with its commitment to providing customers with the latest innovations in HDD equipment, Vermeer’s Ultra X3 drilling system is a unique, non-torqued spline connection system, offering compatibility with a wide range of pilot bit and pullback configurations. The needs of tomorrow’s job sites are quickly evolving, the need to do more with less.
Vermeer’s Ultra X3 drilling system’s interchangeable pilot and pullback tooling puts it miles ahead of the competition. The system has the ability to ream directly off the transmitter housing and can eliminate the expense of starter rods and adapters in certain applications. Specifically designed for utility-sized rigs digging in most ground conditions, the drilling system improves the operator’s ability to move from one drill to another and maintain familiarity with the HDD tooling.
The Ultra X3 has a strong spline connection capable of handling the torque of reaming diameters up to 12 inches (30cm) directly off the transmitter housing in most conditions. This versatile housing unit comes in three sizes and is available for rigs up to 40,000 pounds (18,143kg).
The Ultra X3 Drilling System reduces the size of the exit pit required for jobs – thus removing the time required to dig an exit pit, reducing disruption and rehabilitation of exit pits – optimising jobsite efficiency and further adding to its ingenuity. Since the Ultra X3 doesn’t require the housing be removed for most pullbacks, HDD crews can change over from pilot to pullback in a smaller space with less repetitive lifting. No specialist tooling required, simply remove two high capacity dowl pins and change the tooling.
Experts in tooling
Offering in-depth knowledge and expertise, Vermeer HDD tooling specialists are available at local dealerships and can give customers the lowdown on what’s going on with their machines, the ground conditions, their mud mix or the tooling they need to complete the next job. It is important to the company that the parts and pieces of HDD tooling produced meet high standards. As such, Vermeer is one of the only manufacturers in the industry to invest in not only building its own metallurgy lab but also staffing it with experienced metallurgists.
Vermeer Australia prides itself on its informed and experienced team of experts, and its tooling specialists are no exception, with a focus on tooling and a commitment to working with customers to help them select the most suitable tooling for ground conditions, drill size and type, and other considerations.
More News and Articles
Apr 29, 2024
News
Minimising cultural impacts with trenchless
Through the benefits of trenchless technology, Yarra Valley Water is minimising impacts on the Upper Darebin Creek branch sewer project.
The project consists of building a 2.7km sewer pipe in Epping, …
Apr 26, 2024
News
Bothar’s cutting head innovation
The trenchless industry in Australia continues to grow and the need to provide customised solutions becomes vital for a leading subsurface contractor.
Recognising the need for advanced solutions to meet the growing …
Apr 24, 2024
News
Sustainable drainage solutions: German Start-up transforms urban water management.
Germany boasts a well-established infrastructure for managing rainwater and wastewater, yet many developing countries lack such systems. Addressing this gap, …
Apr 19, 2024
News
WATCH: Overnight with SAERTEX-LINER H20 in São Paulo
Available through Pipe Core, high-quality liner SAERTEX-LINER H20 performed under pressure in São Paulo, Brazil.
Maintaining aging potable water pipe infrastructure is a constant challenge …
Apr 17, 2024
News
Immersive media provides wastewater experience in Denmark
An immersive media experience (IMX) may not be what most people want when they think about industrial wastewater, but that is exactly what visitors can expect when they visit a new installation …
Apr 15, 2024
News
Spotlight on gender diversity at Pipe Core
Since founding in 2008, Pipe Core’s team has grown across all areas of the business and is now in a position where there are more females than males across the organisation. Research published in Harvard …
Apr 12, 2024
News
New Wave of Startups Scale Innovation to Solve Global Water Challenges
Innovators from Around the World Join Xylem’s 2024 Accelerator Program to Deploy Breakthrough Innovations for Utilities and Industrial Users of Water
A new group of startups …
Apr 08, 2024
News
Integrated sustainable electricity and clean drinking water systems
Altitude Water and New Use Energy Solutions have partnered to create integrated, mobile solar-plus-water generation systems that produce sustainable electricity and clean drinking …
Apr 05, 2024
News
How to Evaluate Hydraulic Fracture Risk in HDD Design
The design of horizontal directional drill (HDD) installations often requires an evaluation of the potential for hydraulic fracture of the soil layers through which an HDD passes. Evaluating …
Apr 02, 2024
News
Historic Project Linking Rome and Vatican City Uses Advanced Technology and Local Knowledge to Keep Water Flowing
Relocation of Major Sewer Infrastructure Enables Construction of Pedestrian Link for 35 Million Visitors to the 2025 Jubilee
Water …
Mar 27, 2024
News
USU Study Looks at Water Main Break Rates in the U.S. and Canada
Report Highlights Correlation Between Material and Diameter
Utah State University (USU) has published new research on water main breaks in the United States and Canada, examining …
Mar 26, 2024
News
Update BE-21: New Material in Course and Modules on Trenchless Pipe Installation
Online training on the topic of pipeline installation in civil engineering: Trenchless technology for underground drainage construction can be a resource-efficient, …
Contact
Vermeer Australia
147 Archerfield Road
Richlands QLD 4077 Brisbane
Australia
Phone:
+66 73564 4400