To prevent an immediate movement of the trolley during assembly, the side panels are also folded forward. In addition, a gate is opened in the central shield. After the assembly, the self-guided flushing shield is driven through the section of sewer to be cleaned. The shield height amounts to about 50 % of the sewer height. Initial problems caused by the jamming of the upper guidance rollers on lateral connections were solved by an additional installation of guides at the flushing shield.
Typically, your browser supports the following keystroke commands:
[Ctrl]+[+] Enlarge text fonts
[Ctrl]+[-] Downsize text fonts
[Ctrl]+[F] Find text in local page
© 2024 visaplan GmbH, a subsidiary of Prof. Dr. Ing. Stein & Partner GmbH
UNITRACC 3.10.15.1