BE-02 Open Cut Method: Utility Trench Construction - v01

The construction of sewers is still often carried out in the form of open cut construction. Depending on the design, this results in different pipe-soil systems with different external loads on the sewer.

After completing this module, you will have a sound knowledge of:

  • rules and regulations;
  • requirements for planning, tendering and construction of the pipeline zone, the shoring and the components and building materials;
  • procedures for dewatering and
  • process sequences of the open construction method.

Access is restricted.

Click here to be prompted for your credentials.

Prof. Dr.-Ing. Stein & Partner GmbH (2016)


Domain

Open cut method


Keywords

Open Cut method, Planning and design