BE-15 Pipes and Materials: Welding of Plastic Pipes

Heating element butt welding

Sources of failure

  • Wrong calculation of the welding pressure
  • Non-observance of the heating-up time, relocation time or preparation time of joining pressure
  • Non-observance of welding temperature (too high or too low)
  • Machine is defect
  • Machine is not calibrated
  • Chosen welding pressure cannot be maintained (e.g. because of leaky piston connection)
  • Contaminated joint surfaces
  • Wrong material matching
  • Material residues at heated tool

 

/ 87