Finishing work

The external and internal welding beads that are formed can be removed if desired.

If the weld bead requires finishing this is best done before cooling – approx. 2/3 of the cooling time – is complete. There is a danger that cutting work on the cold bead will cause notches [Simona11].

image
Image: 

Device for removing the internal welding bead for HD-PE pipes [FI-WIDOS]

image
Image: 

Arrangement for removing the internal welding bead for HD-PE pipes (Locheisen) with reference to [Miege89a] [Source: STEIN Ingenieure GmbH]

image
Image: 

Device for removing the external welding bead for HD-PE pipes [FI-WIDOS]