BE-15 Pipes and Materials: Welding of Plastic Pipes
Heating element butt welding
Preparatory work
-
Checking the roundness of the pipes and adjusting if necessary
-
Clamping the pipe ends axially into the welding slide
-
Processing the pipe ends by squaring-off and cleaning them, if necessary
-
Checking the plane parallelism and displaced joints and adjusting, if necessary
-
Cleaning the heating element
-
Checking the temperature of the heating element
-
The pipe ends should be axially aligned before clamping in the welding machine
-
Cleaning of the bonding surfaces of the pipe end to be welded by mechanically removing soiling, separating layers, oxidation layers etc.
|
|
HD-PE-pipes rolled off the bundled coil are often of oval shape; therefore, the pipe ends to be weld-shut are first to be adjusted by adequate redeformation measures.
|
/
87
Help for presentation mode
Show / hide the Table of Contents
Go to previous page
Go to next page
Show additional information for the current page
Show this help
Useful browser keystrokes
Typically, your browser supports the following keystroke commands:
[Ctrl]+[+] Enlarge text fonts
[Ctrl]+[-] Downsize text fonts
[Ctrl]+[F] Find text in local page