EPS begins pipeline construction
Nov 26, 2007
The first shovel of earth has been turned for the construction of the Ethylene Pipeline South (EPS). The start of excavation in Gaimersheim near Ingolstadt, Germany, marked the beginning of work on the first of 360 kilometers of pipeline in the EPS. Plans call for the pipeline to reach from Münchsmünster in Bavaria across Baden-Württemberg to Ludwigshafen in Rhineland-Palatinate. Once put into service – planned for September 2008 – the pipeline will connect ethylene producers and processors in southeastern Bavaria with the ethylene center in Northwest Europe.
Dr. Gerhard Roiss, Chairman of the EPS Advisory Board and OMV Deputy Chairman, believes that EPS will play a key strategic role: “It will move Bavaria off the island it now occupies and link it up with the Trans-European pipeline network – via Ludwigshafen and all the way to Rotterdam. EPS will open other doors as well, enabling the expansion of the European network across Austria and to the East, for example, as well as toward France.”
According to Dr. Josef Ertl, CEO of Vinnolit GmbH & Co. KG and a member of the EPS Advisory Board, the start of excavation work will bring closer two major benefits for chemical companies. “For one thing, the vital supply of ethylene will become more flexible, and we will be able to react better to fluctuations in the market and in capacity. At the same time, securing the supply of raw materials for the long-term will give the industry the planning security it needs for future investments.”
The work of laying the pipeline has been awarded to respected European companies, and the segment within Bavaria is scheduled to be completed by the end of 2007. If recultivation is possible in the spring, the topsoil will be returned and the original condition of the land restored. “We have promised the affected farmers that we will do that,” said EPS General Manager Dr. Werner Döhler, “and we take that promise very seriously.”
A few days following the beginning of excavation in Bavaria, work will also start in Rhineland- Palatinate. The general contractor there is the Corporate Engineering unit of the EPS shareholder BASF.
“Our project is right on schedule,” noted EPS General Manager Hans-Detlef Dreeskornfeld. “We will meet our scheduling and financial targets.” The EPS has already secured most of the necessary rights-of-way in Bavaria. “That’s why we are starting with construction now,” said Mr. Dreeskornfeld. “In securing these rights-of-way we take great care to find flexible and voluntary solutions that are fair for all sides. When necessary, we have adjusted the amounts foreseen for compensation. However, if despite all our efforts an amicable settlement cannot be reached with individual land owners, we will strongly encourage the political bodies of Bavaria to ensure that, in light of the significance of this infrastructure project for the common good, a legal basis for expropriation can be created.”
Background:
Ethylene is produced in a refinery by cracking naphtha. In the petrochemical industry it is an important elementary compound for the production of many products used today in day-to-day life, including household appliances, films, bottles, window frames, pipes and flooring materials. The ethylene market is closely coupled with the demand for plastics, which in turn is dependent on the growth of gross domestic product. In coming years, growth of 2% is expected in Western Europe, with 5.5% forecast for Central and Eastern Europe.
Contact information:
EPS Ethylen-Pipeline-Süd GmbH & Co. KG
Information Office
Sylvie Tutsch
Prinzregentenstraße 18
80538 Munich
Germany
Phone: +49 (0) 89 2323917-0
Fax: +49 (0) 89 2323917-99
eMail: Sylvie.Tutsch@eps-pipeline.de
Web: http://www.eps-pipeline.de
More News and Articles
Apr 26, 2024
News
Bothar’s cutting head innovation
The trenchless industry in Australia continues to grow and the need to provide customised solutions becomes vital for a leading subsurface contractor.
Recognising the need for advanced solutions to meet the growing …
Apr 24, 2024
News
Sustainable drainage solutions: German Start-up transforms urban water management.
Germany boasts a well-established infrastructure for managing rainwater and wastewater, yet many developing countries lack such systems. Addressing this gap, …
Apr 22, 2024
News
HDD tooling that gets the job done
Horizontal directional drilling is a dynamic process that constantly changes and adapts to suit a range of applications across utilities and infrastructure. Operators looking to get the most from their equipment …
Apr 19, 2024
News
WATCH: Overnight with SAERTEX-LINER H20 in São Paulo
Available through Pipe Core, high-quality liner SAERTEX-LINER H20 performed under pressure in São Paulo, Brazil.
Maintaining aging potable water pipe infrastructure is a constant challenge …
Apr 17, 2024
News
Immersive media provides wastewater experience in Denmark
An immersive media experience (IMX) may not be what most people want when they think about industrial wastewater, but that is exactly what visitors can expect when they visit a new installation …
Apr 15, 2024
News
Spotlight on gender diversity at Pipe Core
Since founding in 2008, Pipe Core’s team has grown across all areas of the business and is now in a position where there are more females than males across the organisation. Research published in Harvard …
Apr 12, 2024
News
New Wave of Startups Scale Innovation to Solve Global Water Challenges
Innovators from Around the World Join Xylem’s 2024 Accelerator Program to Deploy Breakthrough Innovations for Utilities and Industrial Users of Water
A new group of startups …
Apr 08, 2024
News
Integrated sustainable electricity and clean drinking water systems
Altitude Water and New Use Energy Solutions have partnered to create integrated, mobile solar-plus-water generation systems that produce sustainable electricity and clean drinking …
Apr 05, 2024
News
How to Evaluate Hydraulic Fracture Risk in HDD Design
The design of horizontal directional drill (HDD) installations often requires an evaluation of the potential for hydraulic fracture of the soil layers through which an HDD passes. Evaluating …
Apr 02, 2024
News
Historic Project Linking Rome and Vatican City Uses Advanced Technology and Local Knowledge to Keep Water Flowing
Relocation of Major Sewer Infrastructure Enables Construction of Pedestrian Link for 35 Million Visitors to the 2025 Jubilee
Water …
Mar 27, 2024
News
USU Study Looks at Water Main Break Rates in the U.S. and Canada
Report Highlights Correlation Between Material and Diameter
Utah State University (USU) has published new research on water main breaks in the United States and Canada, examining …
Mar 26, 2024
News
Update BE-21: New Material in Course and Modules on Trenchless Pipe Installation
Online training on the topic of pipeline installation in civil engineering: Trenchless technology for underground drainage construction can be a resource-efficient, …
Contact
EPS Ethylen-Pipeline-Süd GmbH & Co. KG