Virtual Construction Site: Dynamic Pipe Bursting

Replacement of a damaged pipeline over the length of two sections, consisting of DN 300 concrete pipes, in trenchless construction using the dynamic bursting method with simultaneous insertion of a DN 300 HDPE pipe string with an outside diameter of 350 mm.

Click here to open in a new tab or window.

Publisher: Prof. Dr.-Ing. Stein & Partner GmbH, Editorial: R. Stein (2019)


Domain

Replacement by trenchless method » Pipe bursting, pneumatic