(Image: 117556 - Cover picture ) Process: Lining with spirally-wound pipes Title: Renovation of a DN 1200 concrete sewer using Lining with spirally-wound Place: Garden area Boundary conditions: -
System: combined sewer
-
Material: concrete
-
Cross-section shape: circular cross-section
-
Nominal width: DN 1200
-
Depth: 4.2 m (14 ft)
-
Groundwater: fluctuating groundwater level, not relevant during rehabilitation
-
Gradient: approx. 1 ‰
-
Rehabilitation length
|
|
Use of machines and equipment: When using the Lining with spirally-wound pipes, the following machines and equipment are primarily used: -
Truck with workshop space
-
Delivery van for transporting the coiling machine and the material
-
Winding machine
-
Hydraulic drive for the coiling machine in the truck
-
Power generator in the truck
-
Wheel loader with forklift and boom attachment
-
Grout mixing unit
(Image: Truck with workshop ) |
(Image: Truck with … |
|
|
Site set-up The site set-up includes traffic safety, the definition of parking and storage areas for equipment and material as well as the installation of the power and water supply. Due to the location of the starting manhole within the access road to a garden and the existing cramped conditions on the construction site, frequent manoeuvring and repositioning of vehicles and equipment was necessary. The target manhole is located in the middle of a …
|
|
Condition of the sewer before cleaning
(Image: Condition of the sewer to be rehabilitated before cleaning [FI violin].) |
(Image: Condition of the sewer to be rehabilitated before cleaning [FI violin]) |
(Image: Condition of the sewer to be rehabilitated before cleaning [FI-Geige]) |
Sewer cleaning Sewer cleaning is usually carried out using high-pressure cleaning. As the 21 m (69 ft) long sewer section to be rehabilitated was not cleaned at the beginning …
|
|
The hydraulically operated winding machine used in this case is suitable for lining pipelines with diameters from DN 600 to DN 1200. Depending on the diameter to be wound, only different winding cages are used. First, the winding machine, which is disassembled into individual parts, is transported from the delivery truck to the starting manhole by means of a wheel loader with forklift attachment. It consists of a machine drive and a winding cage. …
|
|
To ensure that the beginning of the spirally-wound pipe is later at right angles to the pipe axis, the beginning of the T-Rib profile is sharpened (pointed) over a circumferential length (approx. 3 m (10 ft)) using an angle grinder. For this purpose, the T-Rib profile, which is delivered on a drum and secured for transport is unrolled.
(Image: T-Rib profile on the drum trailer) |
(Image: Securing the T-Rib profile for transport ) |
(Image: Marking … |
|
|
The sharpened (pointed) T-Rib profile is pulled through a guide roller attached to the boom of the wheel loader and inserted into the manhole.
(Image: T-Rib profile guide roller on the boom of the wheel loader) |
(Image: Threading of the T-Rib profile into the guide roller) |
(Image: Threading the T-Rib profile into the guide roller) |
(Image: Threading the T-Rib profile into the guide roller) |
Afterwards it is threaded into the winding machine, guided …
|
|
The annular space between the old pipe and the spirally-wound pipe is closed off by filling it with sulphate-resistant cement mortar up to 20 – 30 cm (8 – 12 in) from the manhole wall into the annular space. First, the annular space is sealed at the high point (here: target manhole). After closing the annular space and installing a ventilation nozzle at the crown (apex), the receiving wastewater is briefly interrupted (water flow control) so that …
|
|
The annular space is grouted in two sections starting from the low point. For this purpose, the mixing unit is positioned near the starting manhole and the filling hose is connected. With one mixing process, approx. 0.55 m3 (145 liq.gal.) of grout (Blitzdämmer®) can be produced with the mixing unit used here. The grout is mixed according to the manufacturer's instructions. For this purpose, the mixing container of the mixing unit is first filled approx. …
|
|
To check the success of the rehabilitation, an inspection of the rehabilitated pipe and a leak tightness test according to EN 1610 are carried out.
|
|
Lining of a DN 1200 concrete sewer with a profiled plastic profile with lock, which is wound in a spiral using a stationary winding machine, and forms a continuous pipe string after installation (SWP winding pipe method).
|
|
Apr 19, 2022
News
Edge Underground
The installation of underground utilities has the potential to cause major disruption to the community and surrounding environment depending on the method used. Microtunnelling offers an alternative solution to open cut methods for installing pipelines quickly and accurately while lowering the social costs.
|
|
Apr 20, 2022
News
Dr. Tarun Gupta
The IIT-Kanpur has invented a novel nano-adsorbent for waste water treatment.
|
|
May 12, 2021
News
Matthew Greger
We are pleased to announce a new partnership between Roxard Industries and Kelley Engineered Equipment LLC. We have combined forces to meet the growing demand for rolling disc cutters, soft ground tools and cutter rebuild services for tunneling and mining projects in North and South America.
|
|
Mar 22, 2022
News
Kathryn Langley
More frequent capture of water supply and distribution data is becoming a must-have for utilities as they strive to build network resilience, improve customer experience and meet regulatory expectations.
|
|
Dec 31, 2021
News
Louise Tjeder
Sandvik has signed an agreement to acquire Australian-based Deswik, the leading and fastest growing major provider of mine planning software. Deswik will be part of a newly formed division Digital Mining Technologies within business area Sandvik Mining and Rock Solutions.
|
|
Jan 03, 2022
News
Stéphanie Malek
59,000 sq. metres of warehouse and office space in Saint-Augustin (Pas-de-Calais)
• Low-carbon concrete and photovoltaic panels to reduce environmental footprint)
• A contract worth about €79 million
|
|
Aug 11, 2023
News
Wei Liao
|
|
Sep 04, 2023
News
Alicia Barbieri
Report highlights American Water’s sustainable impact on communities across the U.S.
|
|
Sep 08, 2023
News
André Langlois
The second of two boreholes beneath the Thames – which will together form London’s new Silvertown Tunnel – is now complete.
|
|
Sep 11, 2023
News
Clemence Carayol
Pezzimenti Trenchless continues to showcase its position as a leading trenchless specialist by completing works on two Victorian projects.
|
|
Sep 13, 2023
News
Clemence Carayol
Mullane once again proved why the company is an industry leader in pipeline solutions with a relining project on the mid north coast of New South Wales.
|
|
Sep 18, 2023
News
Cindy Riley
Designed to reduce pollution in Lake Erie by four billion gallons per year, Project Clean Lake is a 25-year plan being overseen by Cleveland's Northeast Ohio Regional Sewer District (NEORSD). When construction crews complete the $3 billion undertaking in 2036, 98 percent of flows entering the combined system will be fully treated at the agency's three wastewater treatment plants.
|
|
Jul 03, 2023
News
Vivien Topalovic
Tunnelling contractor Rob Carr successfully demonstrated its versatility through completion of
intricate bypass works.
|
|
Jul 05, 2023
News
Lauren Gill
Peristaltic pumphead runs for three years without maintenance downtime. Risk of polymer leaks at US water treatment plant eliminated. Successful trial leads to dosing pump orders for new water treatment plant.
|