Preparatory Work
Installation of Swelling Tapes and Thermocouples
In the case of ground water, it is recommended to install at least one swelling tape between the preliner or lining tube and the host pipe in all manholes to facilitate the later manhole connection.
Thermocouples are installed in all accessible manholes to check the curing process and to check the reaction temperature during the curing process.