BE-13 Renovation: Lining with Cured-In-Place Pipes - Processes - v01

Inversion with Water

Inversion Scaffold (2)

If the lining tube is inverted up to half of the sewer section to be rehabilitated, a rope for further control of the inversion speed and a hot water hose is attached to the rear, closed end of the tube.

After the lining tube has been vented via the head, inversion is continued.

 

/ 88