BE-13 Renovation: Lining with Cured-In-Place Pipes - Final Work, Accep...

Final Work, Acceptance, Renovation Defects

Final Work

To finalise the CIPP product, the following steps need to be done:

  • Opening the cured-in-place pipe
  • Visual (CCTV) inspection
  • Leak tightness test
  • Site sampling
  • Lining termination (re-establish manhole access, channel of intermediate manholes)
  • Reconnections to existing pipeline system

 

/ 69