BE-13 Renovation: Lining with Cured-In-Place Pipes - Final Work, Accep...

Lining Observations

How to Deal with Folds?

Table: 

Dealing with folds [Haacker2015]

Type of fold Possible measures (individual case consideration necessary, static requirements are fulfilled)
Longitudinal fold not filled Milling and waterproof filling for polymeric fibre liner, or leaving the fold intact for glass fibre liner
Longitudinal fold filled For polymeric fibre liner, or milling off and leaving the fold intact for glass fibre liner
Hidden fold
If necessary, grouting the cavity in the apex area
Invert fold Residual styrene test on UV hardened liners. Within accessible cross sections, new lamination of the damaged areas
Circumferential fold not filled Does the fold represent a drainage obstacle? Either leave the fold or see above
Circumferential fold filled Does the fold represent a drainage obstacle? Either leave the fold or see above
Conform fold Check material characteristics. If possible, leave the fold intact
Over-expansion Annular gap test, material test, if results within the tolerable range, keep it as it is

 

/ 69