Quality Control by Documentation of the Rehabilitation Measure

The documents listed below should be submitted to the client:

  • Protocols of the CCTV-inspections including the records
  • Proof of the preparatory work
  • Proof of the reconnection of laterals
  • Delivery note of the lining tube
  • Recording of the tensile forces determined during winched in place installation
  • Documentation of continuously measured pressure, temperature and/or UV light parameters
  • Construction diary (site journal)
  • Leak tightness test reports.