VINCI Construction UK wins two Saudi Arabian contracts
Oct 10, 2012
VINCI Construction UK, in a joint venture with Al Muhaidib Contracting Company (AMC), has won two separate contracts in Jeddah with the Saudi Arabian National Water Company. The contracts, with a combined worth of over £110 million, are for the design and build of the Briman Strategic Water Reservoir and the Al Khumra Lifting Station.
Forming part of a major water initiative recently launched in Saudi Arabia, the water reservoir will be a two year project and will involve the design and construction of a 1.5 million cubic metre water storage facility, as well as a year of operation and management of the reservoir.
Over a 12 month period, the Treated Effluent Lifting Station will be designed, procured, and constructed, after which a one year operation and maintenance contract will follow. The station will collect treated water from existing plants into an underground wet well and pumping station.
“The National Water Company has embarked on a robust program to improve and develop the water and wastewater services in major cities in the Kingdom which includes Riyadh, Jeddah, Mecca and Taif, with a total budget allocation of 20 Billion Saudi Riyals (£3.4Bn)” said Chief Executive Officer of the National Water Company Loay Al-Musallam. “The company has succeeded in implementing a large number of strategic projects within this allocation including the creation of strategic reservoirs, transmission lines, constructing new pumping and lifting stations, household water and sewage services and the rehabilitation of existing pumping stations”, he added.
Commenting on the contract wins, Ivan Norris, Managing Director of the Gulf Region for VINCI Construction UK, said “We are delighted to be working with AMC on the two National Water Company initiatives. These projects play a crucial part in the water infrastructure in the country and we are pleased to use our expertise to deliver the projects.”
Ajaz Shafi, VINCI Construction UK’s Country Manager in Saudi Arabia, said “With the construction industry buoyant in Saudi Arabia we are able to work on many diverse projects requiring specialist skills and it is great to be working with the National Water Company where we can show our strength through our commitment, ideas and expertise.”
VINCI Construction UK has worked widely across the Middle East over a number of years completing landmark projects including the Dubai Dry Docks in the United Arab Emirates and the Islamic Finance Bank in Jeddah, Saudi Arabia.
VINCI PLC Chief Executive and Chairman John Stanion said of the latest contract wins, “We have a track record of working successfully in the Gulf Region and we bring a wealth of experience to these projects.”
More News and Articles
Apr 26, 2024
News
Bothar’s cutting head innovation
The trenchless industry in Australia continues to grow and the need to provide customised solutions becomes vital for a leading subsurface contractor.
Recognising the need for advanced solutions to meet the growing …
Apr 24, 2024
News
Sustainable drainage solutions: German Start-up transforms urban water management.
Germany boasts a well-established infrastructure for managing rainwater and wastewater, yet many developing countries lack such systems. Addressing this gap, …
Apr 22, 2024
News
HDD tooling that gets the job done
Horizontal directional drilling is a dynamic process that constantly changes and adapts to suit a range of applications across utilities and infrastructure. Operators looking to get the most from their equipment …
Apr 19, 2024
News
WATCH: Overnight with SAERTEX-LINER H20 in São Paulo
Available through Pipe Core, high-quality liner SAERTEX-LINER H20 performed under pressure in São Paulo, Brazil.
Maintaining aging potable water pipe infrastructure is a constant challenge …
Apr 17, 2024
News
Immersive media provides wastewater experience in Denmark
An immersive media experience (IMX) may not be what most people want when they think about industrial wastewater, but that is exactly what visitors can expect when they visit a new installation …
Apr 15, 2024
News
Spotlight on gender diversity at Pipe Core
Since founding in 2008, Pipe Core’s team has grown across all areas of the business and is now in a position where there are more females than males across the organisation. Research published in Harvard …
Apr 12, 2024
News
New Wave of Startups Scale Innovation to Solve Global Water Challenges
Innovators from Around the World Join Xylem’s 2024 Accelerator Program to Deploy Breakthrough Innovations for Utilities and Industrial Users of Water
A new group of startups …
Apr 08, 2024
News
Integrated sustainable electricity and clean drinking water systems
Altitude Water and New Use Energy Solutions have partnered to create integrated, mobile solar-plus-water generation systems that produce sustainable electricity and clean drinking …
Apr 05, 2024
News
How to Evaluate Hydraulic Fracture Risk in HDD Design
The design of horizontal directional drill (HDD) installations often requires an evaluation of the potential for hydraulic fracture of the soil layers through which an HDD passes. Evaluating …
Apr 02, 2024
News
Historic Project Linking Rome and Vatican City Uses Advanced Technology and Local Knowledge to Keep Water Flowing
Relocation of Major Sewer Infrastructure Enables Construction of Pedestrian Link for 35 Million Visitors to the 2025 Jubilee
Water …
Mar 27, 2024
News
USU Study Looks at Water Main Break Rates in the U.S. and Canada
Report Highlights Correlation Between Material and Diameter
Utah State University (USU) has published new research on water main breaks in the United States and Canada, examining …
Mar 26, 2024
News
Update BE-21: New Material in Course and Modules on Trenchless Pipe Installation
Online training on the topic of pipeline installation in civil engineering: Trenchless technology for underground drainage construction can be a resource-efficient, …
Contact
VINCI Construction UK Ltd.
Melanie Mathews
Imperial Way, Watford
WD24 4WW Hertfordshire
United Kingdom
Phone:
+44 (0) 1923 / 233433