Simple Steps to Keep Onsite Treatment Within Consent
May 15, 2020
With the Environment Agency making clear to the water industry its expectations for zero pollutions, the need for robust wastewater treatment has never been greater, says Andrew Baird, WPL’s technical director. The regulator’s toughening approach to discharge permit breaches, a number of high profile prosecutions and record fines for polluters, along with increased public awareness, means customers are also demanding more from their water utilities.
While much of the Environment Agency’s scrutiny has been directed at the water sector – in 2019, it told the industry to clean up its act and protect the environment from pollution – it is clear that all companies with onsite treatment are coming under increasing pressure to have reliable processes in place.
A breach of trade effluent consent, which is granted by water companies to companies that discharge into the public sewer, is a criminal offence and penalties can range from an early warning notice to a fine or prosecution or, in the most serious cases, imprisonment.
Financial and reputational implications are also significant. The cost of reactive mitigation for the most serious breaches, such as clean-ups or tankering, can potentially run into millions and risks thrusting the company brand into the spotlight for the wrong reasons.
WPL specialises in packaged wastewater treatment plants and sees different companies making the same avoidable mistakes that result in permit breaches - but the solutions are often simple.
Maintain onsite equipment
Equipment failure lies behind the majority of permit breaches, and often occurs due to a lack of maintenance.
When it comes to commercial or industrial companies, onsite effluent treatment is not necessarily seen as a core part of the operation and interest can be lacking. This can result in this vital equipment, that may underpin the efficiency of the whole site, being some of the least loved.
When installing new kit, we advise management to give the responsibility of maintaining it to specific employees who understand not only the mechanics but also the importance of the plant. Having enthusiastic champions of the equipment means it is more likely to receive the attention it deserves. Of course, with the Covid-19 pandemic leading to urgent reviews of business continuity plans, it seems good practice to assign this responsibility to a team rather than an individual, so the knowledge is not lost if one person becomes unavailable
Testing and trials
Performance and commercial shocks caused by discrepancies between designs and the delivery of a project can be avoided by conducting detailed reviews and pilot trials ahead of installing permanent plant. WPL can undertake in-depth advance testing in two ways - laboratory testing and onsite pilot trials.
Industrial laboratory service
Bespoke lab-scale reviews are conducted at WPL’s in-house facility to ascertain the profile of the effluent and ensure that the correct dosing regime is implemented, based on the requirements of environmental discharge permits. WPL’s process scientists carry out a separation test on effluent samples from the specific site and replicate appropriate treatment processes from WPL’s range which includes dissolved air floatation (DAF), biological treatment and settlement options.
Depending on the specific consent requirements, scientists can monitor chemical oxygen demand (COD) and biochemical oxygen demand (BOD) and levels of pollutants such as greases, phosphates, nutrients and nitrates to see if they are achieving the separation required.
Based on the analysis, a report is produced that determines the best technology and cost of the final scheme. This kind of testing has a quick turnaround with results returned in about a week. It causes little disruption to the customer and allows designers to rule out different technologies, saving time in researching options that might not work.
Onsite pilots
Following a lab review, an onsite pilot project is usually recommended to identify the precise equipment required. Pilots allow engineers to really look closely at factors including chemical and power consumption and sludge production to give a very accurate indication of how the plant will operate and the costs, giving the customer confidence that there will be no surprises. They can seem expensive but they may save money in the long run.
WPL recently built a permanent dissolved air flotation (DAF) unit on the site of a food manufacturer, which only wanted a lab review and not a pilot. It transpired the effluent being discharged was different from the sample given for lab testing – the sugar content differed vastly and could not be effectively removed.
Samples are variable in industrial treatment and the pilot would have picked this up very quickly, saving the customer time and money. An additional biological treatment plant has since had to be installed on the site.
Repurpose existing equipment
The solution to failing consent may not always require a large investment or the rebuilding of infrastructure. In many cases, just a single piece of equipment is needed, or, where an existing piece of kit fails, it can often be repurposed.
WPL’s Hybrid-SAF™ is a highly efficient biological treatment technology with custom-built cells can be retrofitted into any onsite vessels regardless of shape or size. This can improve the process to give it a 20-year life expectancy to meet consent and is significantly cheaper than rebuild projects.
Staff training
Of course, the solution to consent failure may not even be engineering-based. It can be a case of better staff training and revamped internal policy. For example, in the food industry, breaches can occur because employees are not scraping utensils before they wash them, meaning food debris and grease washes into the public sewer – resulting in a breach.
Education and ongoing training can really help prevent equipment and processes breaking down, ensuring the treatment plant remains fully compliant and continues to protect the environment. WPL can offer advice on all of these issues and support companies who are concerned about onsite treatment facilities failing consent.
More News and Articles
Dec 01, 2023
News
TBM on site for Melbourne CBD sewer upgrades
A microtunnel boring machine (TBM) has arrived on Elizabeth Street to help deliver one of the biggest upgrades to Melbourne CBD’s sewer network in more than a century.
Nov 29, 2023
News
Shedding light on evaporation
Researchers at MIT (Massachusetts Institute of Technology) have made a groundbreaking discovery that could change our understanding of evaporation, a ubiquitous process in our environment. They found that under certain conditions, light can directly cause evaporation without the need for …
Nov 27, 2023
News
NEW UNITRACC Construction Site Documentation: "Rehabilitation of a DN 400 Concrete Gravity Sewer with a SAERTEX-LINER® MULTI over a Length of 69 m" (CIPP)
New construction site documentation in the renovation section of the e-learning platform: Rehabilitation of a DN 400 concrete gravity sewer with CIPP lining using SAERTEX-LINER® MULTI, type S+ Standard. The objective of this rehabilitation measure was to enhance the structural …
Nov 24, 2023
News
Tracto grundoram supports sewer replacement at coastal town
Budleigh Salterton is a popular and picturesque seaside town situated within the East Devon Area of Outstanding Natural Beauty. Located at the start of the stunning Jurassic Coast; a UNESCO World Heritage Site recognised for its outstanding rocks, fossils and …
Nov 22, 2023
News
Interflow’s sustainability strategy
Having been in business for 86 years, Interflow has proven it knows a thing or two about longevity. Right now, that requires an all-encompassing sustainability strategy, as Richard McCarthy, Interflow’s executive general manager southern region, explained.
Nov 20, 2023
News
Mastering public sector challenges together
An interview with Managing Director Robert Ristow
Nov 17, 2023
News
Tractebel and Aurecon forge strategic partnership to revolutionize dam projects in Queensland, Australia
Tractebel and Aurecon form a strategic alliance to revolutionize dam projects in Queensland, Australia, combining their global expertise and local knowledge to meet the rising demand for dam upgrades.
Nov 15, 2023
News
HDD to help Monarto pipeline project
SA Water will use horizontal directional drilling (HDD) to assist in installing a section of pipe underneath the Melbourne to Adelaide rail corridor.
Nov 13, 2023
News
Neom’s sustainable water solutions with renewable desalination
Saudi Arabia’s visionary city, Neom, is leading the way in sustainable water solutions with the construction of a desalination plant powered entirely by renewable energy.
Nov 10, 2023
News
Adept delivers on Geelong infrastructure project
Adept Civil Group has successfully delivered on a sewer reticulation extension project at the Charlemont Rise estate.
Nov 09, 2023
News
NEW LAUNCH: UNITRACC Module "Details on the Installation of Lining with UV Cured-in-Place Pipes" (Renovation: CIPP)
Introducing the new e-learning module for the course "Renovation: Lining with Cured-In-Place Pipes"! This module focuses on the installation of UV CIPP using the high-quality SAERTEX-LINER® specifically designed for gravity pipes and sewers - with contributions by renowned manufacturer SAERTEX …
Contact
WPL Ltd
Lianne Ayling
Marketing Manager
Unit 1 Aston Road
Hampshire PO7 7UX Waterlooville
United Kingdom
Phone:
+44 2392 242 635