Profit from profile measurement with Amberg Control
Dec 05, 2014
Amberg Technologies presents new software solutions for tunnel construction projects
The demands on state-of-the-art tunnel construction are immense: the greatest possible cost-effectiveness from the first blasting round to the final construction is key. Cost-saving solutions are required while retaining highest precision and quality. In order to better meet those requirements, Amberg Technologies has developed the new Amberg Control system solution. This software enables creating complete and significant reports on all recorded profile measurement data in no time.
The software generates data on as-built comparisons as well as meas. vs. meas. comparisons. From first blasting round control and the calculation of the geological over-profile to non-destructive concrete layer thickness control, Amberg Control provides all key tunnel construction project data in a reliable and swift manner. One distinguishing advantage of Amberg Control is the broadened import interface, enabling the use of data by different total stations.
This independence from measurement instruments provides users with greater flexibility during data analysis. Furthermore, Amberg Control for the first time enables complete 3D calculation and visualisation from measurement data. “This new feature allows us to meet increased customer demands as the swift and easy interpretation of measurement results is vital in state-of-the-art tunnel construction“, according to Oliver Schneider, Product Manager Tunnel at Amberg Technologies.
The 3D calculation of measurement data is supported by the new Amberg Applications 6.0. The on-board software for Leica total stations records all profile data without additional hardware. Amberg Control is furthermore fully compatible with the Amberg Navigator – the tablet solution for profile measurements inside a tunnel. “In the process of developing the software, we put great focus on creating fully integrated work and data flows. Thanks to Amberg Control, Amberg Applications and Amberg Navigator, our customers are in full control of tunnel construction measurement technology”, explains Schneider.
Amberg Control constitutes the further development of the Amberg TMS product portfolio. It functionally complements the established TMS profile system solutions. The software is available in two versions: the starter model, Amberg Control Basic, compares as-built comparisons. Amberg Control Plus additionally allows meas. vs. meas. comparisons.
More News and Articles
May 30, 2023
News
Trenchless contractor puts maintenance hole relining system through its paces
Civil and trenchless specialists M Tucker & Sons showcases its expertise through a UV lining project.
May 26, 2023
News
City of Toronto launches tunnel boring machine for stormwater tunnel and largest basement flooding prevention project
Today, the City of Toronto marked a major milestone for the Fairbank Silverthorn Storm Trunk Sewer System project, launching a tunnel boring machine that will work to construct a new storm sewer that will collect, store and move stormwater from …
May 24, 2023
News
Global Water and Wastewater Utilities Take Aim at Climate Change
New Survey of 100 Utilities Tracks Net-Zero Progress: 75% of Respondents to Reduce Greenhouse Gas Emissions by 2040
May 22, 2023
News
Regional San’s monumental wastewater treatment plant expansion project delivered ON schedule and UNDER budget
The EchoWater Project, one of the largest public works projects in the Sacramento region’s history, takes wastewater treatment to a whole new level
May 19, 2023
News
Haliotis 2: Wastewater recovery and treatment complex
In April the future, next-generation wastewater recovery and treatment complex for the Métropole Nice Côte d’Azur “Haliotis 2” was presented. Christian Estrosi, Mayor of Nice, President of the Métropole Nice Côte d’Azur and Deputy President of the Région Provence-Alpes-Côte d’Azur …
May 17, 2023
News
Wrapping up the challenges in SA
In December 2022, Denso Australia completed the supply of a project involving the protection of 400 lineal metres of DN250 mild steel pipeline in Bolivar, South Australia.
May 15, 2023
News
New South Wales university receives network upgrade using SAERTEX-LINER® MULTI Type S+
Australian Pipeline Management (APM) has successfully relined three separate pipelines running under a university in Sydney with UV cured-in-place technology from SAERTEX multiCom® GmbH.
May 12, 2023
News
IMPREG continues to invest in Australian and NZ market
With increasing demand of IMPREG’s unique UV pipe solution, the German company continues to invest in the Australian and New Zealand market.
May 10, 2023
Article
Yonge Street Project Combines Trenchless Rehab and New Install Practices
In the fall 2020, the Regional Municipality of York initiated a project to rehabilitate a 127 m long concrete box culvert under Yonge Street. The Region retained Jacobs Engineering to provide design and construction support services.
May 08, 2023
News
Climate adaption solutions for the water sector in the German-Danish border area
More than 60 participants met in Kolding, Denmark, from March 23 to 24 for the final conference of the INTERREG-Project NEPTUN. In the frame of this project, more than 40 partners elaborated 15 specific climate adaption solutions for the water …
May 05, 2023
News
Primus Line® flies the flag for trenchless solutions in sensitive locations
Primus Line has illustrated the benefits of trenchless technology for pipeline rehabilitation in culturally sensitive areas during two installations for one of the world’s leading mining companies.
May 03, 2023
News
Optimising chemical dosing in a challenging operating climate
Rising operating costs and tightening regulations are presenting major challenges for wastewater treatment plant operators, but better optimisation of chemical dosing can drive efficiencies, says Adeel Hassan, product manager at Watson-Marlow Fluid Technology Solutions.
Contact
Amberg Technologies AG
8105 Regensdorf-Watt
Switzerland
Phone:
+41 44 870 92 22
Fax:
+41 44 870 06 18