Pilot Tube Lubrication Pump
May 28, 2014
Successful guided auger boring contractors know that their bore’s accuracy depends on competent pilot tube steering coupled with ground appropriate lubrication. The 1325G Pilot Tube Lubrication Pump enhances these skills while serving as an invaluable, multi-faceted tool.
The 325 gal (1,230 L) tank offers 2,000 psi (13,790 kPa) of pressure at 7 gpm (26.5L/min) of pump flow, providing enough fluid capacity for the average 400-ft. (122m) bore. The tank can be filled with liquid-based polymers to supply lubrication to the pilot tube string or with water for pressure cleaning operations.
The 1325G design is simple and self-contained. Power is provided via direct-drive from engine to pump through a gearbox. The pump’s in-tank agitation quickly and evenly mixes liquid-based polymers and prevents fluid settlement. A relief valve limits the pump’s pressures as necessary. The electric start Kohler engine offers 14HP (10 kW) at 3,600 rpm’s with a 1.8 gal (7L) gas tank capacity. The empty tank assembly weight is just under 1,000 lbs. (454 kg), making the unit highly portable to and on the project site. The unit’s overall dimensions are 52-in. (h) x 89-in. (l) x 50-in. (w), intended to make container storage possible in colder climates.
The 1325G Pilot Tube Lubrication Pump design integrates several safety features. The stepped platform makes it easy for operators to access or fill the 325 gal (L) tank. The battery is located inside a plastic housing to eliminate contact with operators. The lack of moving parts in the tank makes for safe interior access.
More News and Articles
May 30, 2023
News
Trenchless contractor puts maintenance hole relining system through its paces
Civil and trenchless specialists M Tucker & Sons showcases its expertise through a UV lining project.
May 26, 2023
News
City of Toronto launches tunnel boring machine for stormwater tunnel and largest basement flooding prevention project
Today, the City of Toronto marked a major milestone for the Fairbank Silverthorn Storm Trunk Sewer System project, launching a tunnel boring machine that will work to construct a new storm sewer that will collect, store and move stormwater from …
May 24, 2023
News
Global Water and Wastewater Utilities Take Aim at Climate Change
New Survey of 100 Utilities Tracks Net-Zero Progress: 75% of Respondents to Reduce Greenhouse Gas Emissions by 2040
May 22, 2023
News
Regional San’s monumental wastewater treatment plant expansion project delivered ON schedule and UNDER budget
The EchoWater Project, one of the largest public works projects in the Sacramento region’s history, takes wastewater treatment to a whole new level
May 19, 2023
News
Haliotis 2: Wastewater recovery and treatment complex
In April the future, next-generation wastewater recovery and treatment complex for the Métropole Nice Côte d’Azur “Haliotis 2” was presented. Christian Estrosi, Mayor of Nice, President of the Métropole Nice Côte d’Azur and Deputy President of the Région Provence-Alpes-Côte d’Azur …
May 17, 2023
News
Wrapping up the challenges in SA
In December 2022, Denso Australia completed the supply of a project involving the protection of 400 lineal metres of DN250 mild steel pipeline in Bolivar, South Australia.
May 15, 2023
News
New South Wales university receives network upgrade using SAERTEX-LINER® MULTI Type S+
Australian Pipeline Management (APM) has successfully relined three separate pipelines running under a university in Sydney with UV cured-in-place technology from SAERTEX multiCom® GmbH.
May 12, 2023
News
IMPREG continues to invest in Australian and NZ market
With increasing demand of IMPREG’s unique UV pipe solution, the German company continues to invest in the Australian and New Zealand market.
May 10, 2023
Article
Yonge Street Project Combines Trenchless Rehab and New Install Practices
In the fall 2020, the Regional Municipality of York initiated a project to rehabilitate a 127 m long concrete box culvert under Yonge Street. The Region retained Jacobs Engineering to provide design and construction support services.
May 08, 2023
News
Climate adaption solutions for the water sector in the German-Danish border area
More than 60 participants met in Kolding, Denmark, from March 23 to 24 for the final conference of the INTERREG-Project NEPTUN. In the frame of this project, more than 40 partners elaborated 15 specific climate adaption solutions for the water …
May 05, 2023
News
Primus Line® flies the flag for trenchless solutions in sensitive locations
Primus Line has illustrated the benefits of trenchless technology for pipeline rehabilitation in culturally sensitive areas during two installations for one of the world’s leading mining companies.
May 03, 2023
News
Optimising chemical dosing in a challenging operating climate
Rising operating costs and tightening regulations are presenting major challenges for wastewater treatment plant operators, but better optimisation of chemical dosing can drive efficiencies, says Adeel Hassan, product manager at Watson-Marlow Fluid Technology Solutions.
Contact
Akkerman
266th Street Brownsdale
58256 Minnesota
United States
Phone:
+1 (507) 567 2261
Fax:
+1 (800) 533 0386