Herrenknecht welcomes Federal Minister Gabriel in Schwanau
Feb 26, 2015
The German Federal Minister for Economic Affairs and Energy, Sigmar Gabriel, visited Herrenknecht AG in Schwanau/Baden-Württemberg, the global market leader for tunnel boring machines. Company founder and Chairman of the Board of Management Dr.-Ing. E.h. Martin Herrenknecht introduced the Vice Chancellor to the company and its global project business. The subjects of retirement at 63, youth development as well as geothermal and renewable energy were also discussed on this occasion.
The German Federal Minister for Economic Affairs and Energy, Sigmar Gabriel, visited the world market leader in mechanized tunnelling technology Herrenknecht today. The paths of Vice Chancellor Gabriel and entrepreneur Dr.-Ing. E.h. Martin Herrenknecht had crossed during a trade mission to China in spring 2014.
Company founder and Chairman of the Board of Management Martin Herrenknecht now showed the Minister the company on the ground and informed him about Herrenknecht’s current international project business. A range of different topics were discussed at a meeting with the company’s Board of Management, the Works Council Chairman and political guests from the region. These included geothermal energy in the renewables mix, inheritance tax in the course of generational change in family-run businesses as well as the development of young talents and demand for skilled workers.
According to Martin Herrenknecht, older skilled workers should be rewarded taxwise and not financially penalized if they do not want to retire at the recently newly legislated pension age of 63 and would like to continue working. They are needed, also in the training and promotion of young talents. For Herrenknecht every skilled worker with years of expertise is an invaluable asset to the company.
The subsequent factory tour then also led directly to Herrenknecht’s industrial training workshop. Here young men and women presented interesting workpieces to Federal Minister Sigmar Gabriel. Martin Herrenknecht explained to the Minister: "For cutting-edge technology from Germany we not only need capable engineers or other graduates. In particular we also need practically inclined, technically adept skilled workers who can build the engineers’ designs with precision and the highest quality of execution." Herrenknecht trains around 200 young people in more than ten different apprenticeship occupations, who, particularly in the trades, generally stay with the company on completion of their training.
Federal Minister of Economics Gabriel: "I am impressed by what I have seen today at Herrenknecht AG. Technological expertise and precision work are top priorities. This impressively demonstrates why engineering ‘Made in Germany’ enjoys such an excellent reputation in the world. It is clear that for sustainable quality assurance skilled workers play a key role here locally and we have also spoken about this. The apprentices of today are the skilled workers of tomorrow – if they are absent in the dual training system, they are also absent later in the factories. In the new alliance for education and training, politicians, business, trade unions and the state governments want to work together with substantial contributions to counter this."
Continuing the tour, in the assembly workshops the entrepreneur showed the Minister an important machinery component being manufactured in Germany with special know-how for the Chinese market. It is a gigantic cutting wheel of an XXL tunnel boring machine (Ø 15.76 m) for a multifunctional tunnel in Wuhan, Central China. The contract for this was concluded in the Minister’s presence in spring 2014 during the trade mission he led.
In the 2014 financial year the Herrenknecht Group achieved a new sales record with an order inflow of 1.2 billion euros. Some of the machines ordered by construction companies are currently in assembly and production. In future they will be used for the construction of road, rail and metro tunnels for example in Paris, Doha, Casablanca, Mexico or Norway. In addition to traffic tunnels, water and wastewater systems, gas and oil pipelines, conduits for electricity, internet and telephone lines and tunnels for hydroelectric power plants are driven quickly and safely with mechanized tunnelling technology from Herrenknecht.
More News and Articles
May 30, 2023
News
Trenchless contractor puts maintenance hole relining system through its paces
Civil and trenchless specialists M Tucker & Sons showcases its expertise through a UV lining project.
May 26, 2023
News
City of Toronto launches tunnel boring machine for stormwater tunnel and largest basement flooding prevention project
Today, the City of Toronto marked a major milestone for the Fairbank Silverthorn Storm Trunk Sewer System project, launching a tunnel boring machine that will work to construct a new storm sewer that will collect, store and move stormwater from …
May 24, 2023
News
Global Water and Wastewater Utilities Take Aim at Climate Change
New Survey of 100 Utilities Tracks Net-Zero Progress: 75% of Respondents to Reduce Greenhouse Gas Emissions by 2040
May 22, 2023
News
Regional San’s monumental wastewater treatment plant expansion project delivered ON schedule and UNDER budget
The EchoWater Project, one of the largest public works projects in the Sacramento region’s history, takes wastewater treatment to a whole new level
May 19, 2023
News
Haliotis 2: Wastewater recovery and treatment complex
In April the future, next-generation wastewater recovery and treatment complex for the Métropole Nice Côte d’Azur “Haliotis 2” was presented. Christian Estrosi, Mayor of Nice, President of the Métropole Nice Côte d’Azur and Deputy President of the Région Provence-Alpes-Côte d’Azur …
May 17, 2023
News
Wrapping up the challenges in SA
In December 2022, Denso Australia completed the supply of a project involving the protection of 400 lineal metres of DN250 mild steel pipeline in Bolivar, South Australia.
May 15, 2023
News
New South Wales university receives network upgrade using SAERTEX-LINER® MULTI Type S+
Australian Pipeline Management (APM) has successfully relined three separate pipelines running under a university in Sydney with UV cured-in-place technology from SAERTEX multiCom® GmbH.
May 12, 2023
News
IMPREG continues to invest in Australian and NZ market
With increasing demand of IMPREG’s unique UV pipe solution, the German company continues to invest in the Australian and New Zealand market.
May 10, 2023
Article
Yonge Street Project Combines Trenchless Rehab and New Install Practices
In the fall 2020, the Regional Municipality of York initiated a project to rehabilitate a 127 m long concrete box culvert under Yonge Street. The Region retained Jacobs Engineering to provide design and construction support services.
May 08, 2023
News
Climate adaption solutions for the water sector in the German-Danish border area
More than 60 participants met in Kolding, Denmark, from March 23 to 24 for the final conference of the INTERREG-Project NEPTUN. In the frame of this project, more than 40 partners elaborated 15 specific climate adaption solutions for the water …
May 05, 2023
News
Primus Line® flies the flag for trenchless solutions in sensitive locations
Primus Line has illustrated the benefits of trenchless technology for pipeline rehabilitation in culturally sensitive areas during two installations for one of the world’s leading mining companies.
May 03, 2023
News
Optimising chemical dosing in a challenging operating climate
Rising operating costs and tightening regulations are presenting major challenges for wastewater treatment plant operators, but better optimisation of chemical dosing can drive efficiencies, says Adeel Hassan, product manager at Watson-Marlow Fluid Technology Solutions.
Contact
Herrenknecht AG
Achim Kühn
Schlehenweg 2
77963 Schwanau
Germany
Phone:
+49 (0) 7824 302-5400
Fax:
+49 (0)7824 302-4730