Clock Spring Launches New Water-Activated Product, Contour WA™
Dec 22, 2017
Cost-effective product ensures controlled installation, improves safety and sustainability.
Clock Spring Company, LP, the world’s leading manufacturer of permanent and temporary composite pipeline and pipe work repair solutions, has launched Contour WATM, a composite solution featuring an engineered, bi-axial stitched e-glass tape impregnated with a water-activated polyurethane resin. The new product, which is designed for application on lines to 1,500 psi, repairs corrosion and mechanical damage on process piping in the downstream sector and is ideal for repairs involving complex geometries. It is designed for abrasion-resistant coatings and for horizontal directional drilling runs for pipes under roads and rivers and is suitable for use offshore.
“Controlling installation variables and increasing safety are first principles in Clock Spring’s R&D program,” says Clock Spring Chief Executive Officer Matt Boucher, explaining that all Clock Spring solutions are executed without hot work or welding and require no complicated and heavy installation equipment. “While other water-activated pipe repair products are available on the market, none offer the full solution provided by Clock Spring Contour WA, which is installed following a precise process that reduces HSE risks.”
The Contour WA solution includes several innovative elements to provide a controlled installation that delivers increased safety and sustainability. The product is packaged with the Clock Spring SprayerTM, a measured dispenser that ensures an accurate and consistent water-to-resin ratio to guarantee proper curing and a quality repair. Meticulous control during installation of Contour WA prevents over-wetting, eliminating wastewater and the associated potential for EPA violations, unlike the processes used for competing products, which result in excess water dripping off the pipe as contaminated wastewater.
The Clock Spring solution also employs a wet film thickness meter to ensure the proper amount of primer is applied prior to installation. Once the Contour WA is in place, Clock Spring AnchorPlyTM secures the installed repair to facilitate curing. Clock Spring AnchorPly requires no sanding or perforating prior to the final UV coating process, which means there is no dust produced in the installation process that potentially could be inhaled by the installer. And by eliminating the commonly used “porcupine” perforation tool, Clock Spring removes dangerous tool handling by the installer. When the Contour WA installation is complete, a durometer hardness gauge, included in the Clock Spring QC kit, allows installers to verify fibers have cured properly.
“Clock Spring is driving an increased level of sophistication in product development in the composite pipeline repair industry,” Boucher says. “Quality control, safety, and sustainability are as important to Clock Spring as developing products that are cost effective and easy to install to deliver consistent, reliable results.”
This approach to product development changes the playing field. “No longer do customers have to accept inflexible options such as cement or welded sleeves,” Boucher says. “Composite technology offers a safe alternative to pipeline repair and maintenance. Clock Spring’s innovative new Contour WA solution is another example of how Clock Spring is elevating the industry standard.”
About Clock Spring
Clock Spring helps drive global economies by ensuring critical infrastructure is managed safely and sustainably. The company’s composite pipeline repair products have been deployed in 75 countries and are easy to install, cost effective to deploy, and durable for decades. Clock Spring solutions also include Snap Wrap, Pipe Support, Contour and Casing Spacers, as well as training services.
More News and Articles
Sep 29, 2023
News
UIC researchers propose dual-pipeline solution for Chicago’s water supply issues
Researchers from the University of Illinois Chicago have proposed a “dual-pipeline” solution to address the region’s water supply issues. The system would feature one line supplying industrial sites with treated wastewater and another conveying drinking water to homes and other …
Sep 27, 2023
News
New Launch: UNITRACC Module "Coding of Damage (Findings), Causes, and Consequences of Damage"!
New e-learning module of the course BE-07 Investigation and Inspection of Sewers and Pipelines now available on UNITRACC!
Sep 27, 2023
News
Report shows how leakage technology is advancing
Any water loss through leaking pipes is unacceptable in the eyes of the public, and on the launch of a deep-dive leakage report from Ovarro, technology leader for leakage solutions, Barbara Hathaway, explains how technologies continue to advance.
Sep 25, 2023
Article
Saving energy: Pumping liquids should follow the heartbeat
Pumping liquids may seem like a solved problem, but optimizing the process is still an area of active research. Any pumping application—from industrial scales to heating systems at home—would benefit from a reduction in energy demands. Researchers at the Institute …
Sep 22, 2023
News
Courtesy of Mcelroy- Mobile App goes live for PPXXI
PPXXI Conference and Exhibition welcomes McElroy Manufacturing, Inc. as the mobile app sponsor. Their sponsorship enhances networking opportunities for the delegates. Scheduled over September 25 -27, 2023, in Lake Buena Vista, Florida, PPXXI is the key technical and business event …
Sep 20, 2023
News
What’s on at Aquatech Amsterdam 2023
Aquatech is the leading water technology show in the world, with over 800 exhibitors and expecting over 22,000 visitors from over 140+ countries.
Sep 18, 2023
News
Cleveland's $3B Project Clean Lake Features Large-Scale Storage Tunnels
Designed to reduce pollution in Lake Erie by four billion gallons per year, Project Clean Lake is a 25-year plan being overseen by Cleveland's Northeast Ohio Regional Sewer District (NEORSD). When construction crews complete the $3 billion undertaking in 2036, …
Sep 13, 2023
News
Mullane rehabilitates heavily deteriorated stormwater pipelines
Mullane once again proved why the company is an industry leader in pipeline solutions with a relining project on the mid north coast of New South Wales.
Sep 11, 2023
News
Pezzimenti Trenchless boasts microtunnelling capabilities
Pezzimenti Trenchless continues to showcase its position as a leading trenchless specialist by completing works on two Victorian projects.
Sep 08, 2023
News
Silvertown Tunnel under Thames - Newham to Greenwich near O2 Arena: See two massive boreholes in east London
The second of two boreholes beneath the Thames – which will together form London’s new Silvertown Tunnel – is now complete.
Sep 04, 2023
News
American Water Issues Sustainability Report
Report highlights American Water’s sustainable impact on communities across the U.S.
Aug 31, 2023
News
Anaergia Selected to Design, Build and Operate Organic Waste-to-Renewable Energy Project in San Diego County
System to provide renewable power, reduce wastewater utility costs, and cut greenhouse gas emissions for East County Advanced Water Purification facility.
Contact
Clock Spring Company
621 Lockhaven Drive
TX 77073 Houston
United States
Phone:
+1-281-590-8491
Fax:
+1-281-590-9528