Aker Wirth tunnel boring machine according to plan on its way to Switzerland
Aug 05, 2010
After having completed the contract for an Aker Wirth tunnel boring machine of 8 m diameter in December 2009, and following an optimal workshop acceptance, the various individual parts of our latest tunnel boring machine left our plant in Erkelenz at the beginning of July. The components are now on their way to Switzerland where a tunnel is to be bored for the extension of a hydroelectric power plant.
Background Information
By the beginning of August all the components will have been transported to the construction site in Tierfehd in the Swiss Canton Glarus, directly on the way up to the Klausenpass (approx. 80 km south of Zürich). On site the machine will be assembled and ready to start drilling operations in the middle of October 2010 as scheduled. The machine is to bore a 4 km access tunnel to the underground cavern which houses the machines for the new pumped storage power plant in Limmern.
The tunnel has a diameter of 8.03 m and goes up from 800 m (above sea level) to about 1700 m at a constant gradient of 24%. For this inclined tunnelling the Aker Wirth TBM has been equipped with additional securing fixtures to cope with rising gradients. Up till now rising inclinded tunnelling has only been carried out by machines up to a diameter of 6 m. The tunnelling of the Limmern access tunnel will therefore be the largest inclined operation of this kind to have ever been carried out with a tunnel boring machine.
The extension of the existing production facility of the Kraftwerke Linth-Limmmern AG with the new pumped storage plant is an important project for Switzerland’s future electricity supply. The order for the tunnel boring machine was placed with Aker Wirth by "ARGE Zugangsstollen Limmern" (AZL) who will carry out the construction of the tunnel. This consortium consists of the companies Rothpletz, Lienhard + Cie AG, Aarau (Switzerland), Baresel GmbH, Stuttgart (Germany), Wayss & Freytag, Frankfurt (Germany), G. Lazzarini & Co.AG, Chur (Switzerland), Andrea Pitsch AG, Thusis (Switzerland) and Ragotti+Weber Bau AG, Nestal (Switzerland).
Contact:
Aker Wirth GmbH
Simone Grüll
Kölner Str. 71-73
41812 Erkelenz
PH.: 02431 83-459
FAX: 02431 83-455
E-Mail: simone.gruell@akersolutions.com
Internet: www.akersolutions.com/akerwirth
More News and Articles
May 30, 2023
News
Trenchless contractor puts maintenance hole relining system through its paces
Civil and trenchless specialists M Tucker & Sons showcases its expertise through a UV lining project.
May 26, 2023
News
City of Toronto launches tunnel boring machine for stormwater tunnel and largest basement flooding prevention project
Today, the City of Toronto marked a major milestone for the Fairbank Silverthorn Storm Trunk Sewer System project, launching a tunnel boring machine that will work to construct a new storm sewer that will collect, store and move stormwater from …
May 24, 2023
News
Global Water and Wastewater Utilities Take Aim at Climate Change
New Survey of 100 Utilities Tracks Net-Zero Progress: 75% of Respondents to Reduce Greenhouse Gas Emissions by 2040
May 22, 2023
News
Regional San’s monumental wastewater treatment plant expansion project delivered ON schedule and UNDER budget
The EchoWater Project, one of the largest public works projects in the Sacramento region’s history, takes wastewater treatment to a whole new level
May 19, 2023
News
Haliotis 2: Wastewater recovery and treatment complex
In April the future, next-generation wastewater recovery and treatment complex for the Métropole Nice Côte d’Azur “Haliotis 2” was presented. Christian Estrosi, Mayor of Nice, President of the Métropole Nice Côte d’Azur and Deputy President of the Région Provence-Alpes-Côte d’Azur …
May 17, 2023
News
Wrapping up the challenges in SA
In December 2022, Denso Australia completed the supply of a project involving the protection of 400 lineal metres of DN250 mild steel pipeline in Bolivar, South Australia.
May 15, 2023
News
New South Wales university receives network upgrade using SAERTEX-LINER® MULTI Type S+
Australian Pipeline Management (APM) has successfully relined three separate pipelines running under a university in Sydney with UV cured-in-place technology from SAERTEX multiCom® GmbH.
May 12, 2023
News
IMPREG continues to invest in Australian and NZ market
With increasing demand of IMPREG’s unique UV pipe solution, the German company continues to invest in the Australian and New Zealand market.
May 10, 2023
Article
Yonge Street Project Combines Trenchless Rehab and New Install Practices
In the fall 2020, the Regional Municipality of York initiated a project to rehabilitate a 127 m long concrete box culvert under Yonge Street. The Region retained Jacobs Engineering to provide design and construction support services.
May 08, 2023
News
Climate adaption solutions for the water sector in the German-Danish border area
More than 60 participants met in Kolding, Denmark, from March 23 to 24 for the final conference of the INTERREG-Project NEPTUN. In the frame of this project, more than 40 partners elaborated 15 specific climate adaption solutions for the water …
May 05, 2023
News
Primus Line® flies the flag for trenchless solutions in sensitive locations
Primus Line has illustrated the benefits of trenchless technology for pipeline rehabilitation in culturally sensitive areas during two installations for one of the world’s leading mining companies.
May 03, 2023
News
Optimising chemical dosing in a challenging operating climate
Rising operating costs and tightening regulations are presenting major challenges for wastewater treatment plant operators, but better optimisation of chemical dosing can drive efficiencies, says Adeel Hassan, product manager at Watson-Marlow Fluid Technology Solutions.