New Belgrade Waterfront Development Specifies Penetron over Traditional System for Concrete Waterproofing
Feb 17, 2022
The completion of Plot 21a, the latest phase of the monumental Belgrade Waterfront development, in December 2021 marks the latest step in a profound transformation of the Sava River waterfront area of Belgrade, Serbia. PENETRON ADMIX, a crystalline concrete waterproofing solution, was specified over a conventional membrane system to counter the high water table from the Sava River, only 100 m from the construction site.
The completion of Plot 21a, the latest phase of the monumental Belgrade Waterfront development, in December 2021 marks the latest step in a profound transformation of the Sava River waterfront area of Belgrade, Serbia. PENETRON ADMIX, a crystalline concrete waterproofing solution, was specified over a conventional membrane system to counter the high water table from the Sava River, only 100 m from the construction site.
As the capital city and largest commercial center of Serbia, Belgrade lies at the confluence of the Danube and Sava Rivers and is home to 1.2 million inhabitants. The city is a key industrial center for Serbia and Southern Europe, with many international railroad lines passing though Belgrade, which is also served by highways and by river vessels traveling up the Danube from the Black Sea or arriving from western Europe via the Main-Danube Canal.
The US$3 billion Belgrade Waterfront development is situated between Belgrade’s historic old town (“Stari Grad”) and the new district of Novi Beograd, an enormous urban complex rising on the right bank of the Sava River. Once completed, the 1.8 million m2 of gross construction area will comprise 250,000 m2 of office space, 7,000 apartment units, and eight hotels.
Creating a New City District
“The Belgrade Waterfront project will also be integrated into the adjacent Sava Park, an extensive green space with sports and recreational facilities, including a multifunctional playing court, outdoor table tennis tables, a 700 m jogging track, a picnic area, a children’s playground, and a communal garden,” adds Theodor Mentzikofakis, Managing Director of Penetron Hellas.
The newly completed Plot 21a phase comprises the “BW Arcadia” and the “BW Aurora” residential towers that feature an in-house kindergarten, verdant atrium gardens, and a ground floor retail area of shops, a supermarket, and restaurants. Located directly opposite Sava Park, the two 23-floor buildings house 488 apartment units, available as 1- to 4-bedroom layouts and penthouses.
The construction site location facing the Sava River made the groundwater situation a concern for the general contractor. Initially, a traditional waterproofing membrane system was considered, but with numerous below-grade concrete structures of the Plot 21a project exposed to the hydrostatic pressure due to the groundwater, a more reliable and practical solution was needed. During the planning phase of the project, the Penetron Hellas team presented a comprehensive concrete waterproofing solution to Mašinoprojekt KOPRING, a high-rise engineering company, and Strabag, the general contractor.
“By offering an integral waterproofing solution that requires no conventional or secondary waterproofing systems, we were able to show how PENETRON ADMIX was a more durable, maintenance-free solution. It would substantially extend the lifetime of the Plot 21a concrete structures, but also help keep this phase of the project on schedule, thanks to its ease of application,” explains Theodor Mentzikofakis. “As a result, Strabag recommended the use of PENETRON ADMIX.”
Resisting High Hydrostatic Pressure
Beton Plus, the ready-mix concrete supplier, mixed PENETRON ADMIX into 25,000 m3 (32,700 yds3) of concrete for the structures of two basement floors to counter the high hydrostatic pressure from groundwater levels exacerbated by the nearby Sava River. Approximately 8,000 m (5 miles) of PENEBAR waterstop strips were used to seal the construction joints.
Easily mixed in during batching, the active compounds in PENETRON ADMIX penetrate deeply into the concrete structure, filling micro-cracks, pores, and capillaries with an insoluble crystalline formation. This prevents water and water-borne chemicals from entering the concrete structures, even under the high hydrostatic pressure generated by the Sava River. In addition, any cracks that may develop during the lifetime of the concrete automatically self-heal, resulting in waterproof and durable concrete for the lifespan of the structure. No further maintenance or treatment is required.
“Work on the next stage of the Belgrade Waterfront development is already in full swing,” adds Theodor Mentzikofakis. “The Penetron System is being added to the new building foundations as we speak.”
More News and Articles
Mar 24, 2023
News
Innovative technologies remove pharmaceutical residues from wastewater
Every year on 22 March, World Water Day reminds us of the importance of one of the most important resources of life. Almost two-thirds of our planet is covered with water, but not even three percent is drinkable freshwater. Every …
Mar 22, 2023
Article
Delivering sustainable solutions to solve water challenges
With British Water’s conference on creating a more sustainable water sector approaching, Stephen Kennedy, head of digital and innovation at MWH Treatment shares his views on celebrating recent successes in creating a more sustainable sector while also discussing the challenge …
Mar 20, 2023
News
Supporting the National Water Strategy through scientific research
This month, the federal government of Germany introduced the first National Water Strategy. “With this strategy, the federal government is shining a spotlight on the necessity of integrated water resource management, serving as a leading example of resource use in …
Mar 17, 2023
News
Trenchless manufacturer celebrates installation of 100,000th liner
SAERTEX multiCom®’s trenchless pipe relining product, SAERTEX-LINER, has been installed for the 100,000th time.
Mar 13, 2023
News
Spring collaborates with Microsoft and Impact X on water innovation
The water sector’s innovation centre of excellence – Spring - is collaborating with Microsoft and Impact X on a new initiative to make tools and funding available for start-ups to accelerate their companies.
Mar 10, 2023
Article
State of Global Water Resources report informs on rivers, land water storage and glaciers
WMO reports on freshwater availability in a changing climate
Mar 08, 2023
News
Australia: Centenarian sewer gets after-dark upgrade
Over 100 years since its inception, Brisbane’s S1 Main Sewer has undergone a seven-year upgrade.
Mar 06, 2023
News
UKWIR gives access to hundreds of water sector research reports
UK Water Industry Research (UKWIR) is providing free access to over 1,000 of its water sector research reports aimed at helping to improve water and wastewater services for customers, and protecting the environment.
Mar 03, 2023
News
Sector must challenge public misconceptions through engagement
The water sector must tackle “unfair criticisms” by sharing more about the great work it delivers, Yorkshire Water’s chief executive, Nicola Shaw, told attendees at British Water’s Better Together reception in Hull.
Mar 01, 2023
News
World-first project to ‘self heal’ cracked concrete using sludge could save $1.4 billion repair bill to Australia’s sewer pipes
Water treatment sludge could be used to prevent 117,000 kilometres of sewer pipes in Australia from cracking in future, without any intervention by humans, helping to save $1.4 billion in annual maintenance costs.
Feb 27, 2023
News
Delaware Water Treatment Plant Opts for Penetron to Protect New Concrete Structures
The final 2022 commissioning of the Doe Run Road Water Treatment Plant enables the city of Newark, Delaware (USA), to increase the quantity and quality of the city's drinking water to better meet growing demand – and EPA guidelines. PENETRON …
Feb 24, 2023
News
Aussie Trenchless: the future of pipe rehabilitation solutions
Aussie Trenchless has been passionate about progressing future infrastructure opportunities and accomplishing superior outcomes since it was founded in 2014.
Contact
The Penetron Group
45 Research Way
NY 11733 East Setauket
Phone:
+1 631 941 9700
Fax:
+1 631 941 9777