The lecture "Lining with site manufactured pipes" deals with the method variants and the application areas of lining with spirally-wound pipes.

According to EN 752-5 [DINEN752-5:1995], renovation is understood to be measures aimed at improving the current functionality of sewage pipes and sewers under full or partial inclusion of their original substance.

The measures used for carrying this out are :

  • Coating processes and
  • Lining processes .
(Image: Damages)
(Image: Distribution of the lining processes)

Full linings serve the purpose of replacing or enhancing the resistance properties to physical, chemical, biochemical and/or biological attacks, for hindering the renewed formation of incrustations, for replacing and/or increasing the static bearing capacity as well as the leaktightness.

(Image: Structural calculation)
(Image: Leaktightness)

Lining processes are differentiated as follows

  • lining with pipes and
  • Lining with installed individual elements (segmental lining process) in the form of
    • Partial segmental lining of the invert region or the gas space and
    • Full segmental lining

Lining with pipes

(Image: Lining with prefabricated pipes) (Image: Lining with site manufactured pipes) (Image: Lining with site manufactured and hardened pipes)

Segmental lining

(Image: Segmental lining)

The lining with pipes is understood to be, similar to (not found),the creation of self-supporting full lining of sewer sections based on

  • Prefabricated pipes;
  • Site manufactured pipes; and
  • Site manufactured and hardened pipes.

(Image: Depiction of the lining with site manufactured pipes (spiral lining process) using the RIB-LOC-Relining-System as an example with reference to [FI-RIBLOb] - Sketch of principle [Image: S&P GmbH]) (Image: Insertion of …

(Image: PVC-profile PVC HI type 1 - cross section)
(Image: Winding of pipe)

On-site production of a self-supporting lining pipe or of one that is capable of bearing a static load either when placed into the pipeline to be rehabilitated or within this pipeline.

One distinguishes between the following groups of processes :

  • Lining with site manufactured pipes with annular space; and
  • Lining with in site manufactured pipes without annular space.

Both …

RIB-LOC-Relining-System

(Image: Depiction of the lining with site manufactured pipes (spiral lining process) using the RIB-LOC-Relining-System as an example with reference to [FI-RIBLOb] - Sketch of principle [Image: S&P GmbH])

SPR process

(Image: Spiral lining process RotaLoc with reference to [FI-RIBLOa] [Image: S&P GmbH] - Sketch of principle)

The worldwide patented RIB-LOC-Relining system, referred to RIB-LOC-Sliplining in the following, was developed in 1984 in Australia (Australian Patents 527 417 and 530 251) [ATVA115b].

In this system, a special plastics rib profile (RIB-LOC profile) is formed with the aid of a hydraulically working winding machine in the manhole into a circular pipe whose outside diameter is approx. 10 % smaller than the sewer section to be rehabilitated and is continuously …

(Image: Equipment for lining with site manufactured pipes with anular space)

The RIB-LOC-Relining-System requires the following equipment:

  • 3 persons required on the site
  • Winding machine with exchangeable winding forms
  • Hydraulic pump for the drive
  • Holder for the plastics profile pipe roller
  • Light lifting equipment
  • Equipment for leaktightness testing
  • Equipment for annular space grouting
  • Cutting, boring or milling tools for the connections (robot)
(Image: Pros and cons)

Advantages of RIB-LOC-Relining-System:

  • short construction time
  • few traffic restrictions
  • re-establishment or increase of the static load bearing capacity of the pipeline to be rehabilitated
  • possibility to reduce the drainage cross section of hydraulically oversized sewers
(Image: Pros and cons)

Disadvantages of RIB-LOC-Relining-System:

  • extensive re-restablishment of connection sewers in the non-accessible nominal size area when using the open-cut method
  • reduction of the cross section of the pipeline to be rehabilitated
  • damage areas must be sealed first due to strong water infiltration
  • necessity of annular space grouting with buckling risk of the liner
  • wastewater deposits in the annular space lead to cavities in the …

The Japanese SPR process (Sewage Pipe Renewal Method) is characterised by the winding of a liner of PVC rib profiles with steel reinforcing strips within the section of the sewer to be rehabilitated.

The PVC rib profile is wound off a roll and added via an entry manhole to a self-propelling winding machine that moves along an defined space adapted to the contour of the sewer to be lined .

(Image: Spiral lining process RotaLoc with reference to [FI-…
(Table: Comparsion of RIB-LOC-Relining and SPR process [FI-Steina])

RIB-LOC-Expanda Pipe

(Video: Lining with site manufactured pipes without annular space - RIB-LOC-Expanda-Pipe process with reference to [FI-Preus] [Image: S&P GmbH])
(Image: RIB-LOC-Expanda Pipe - Working phase 2: Expanding the lining pipe by pulling the enclosed wire rope (working step 2))

Working phase 1 - winding the lining pipe

(Image: RIB-LOC-Expanda Pipe - Working phase 1: Winding of the lining pipe from starting manhole to target manhole (working step 1)) (Image: RIB-LOC-Expanda Pipe - Working phase 1: Winding of the lining pipe from starting manhole to target manhole (working step 2)) (Image: RIB-LOC-Expanda Pipe - Working phase 1: Winding of the lining pipe from starting manhole to target manhole (working step 3))

Working …

Jun 28, 2021

Modules

The lecture deals with the method variants and the application areas of lining with spirally-wound pipes.

The lecture "Lining with prefabricated pipes without annular space (Lining with close-fit pipes)" describes the two different method variants, deformation process and reduction process, as well as their areas and limits of application.

According to EN 752-5 [DINEN752-5:1995], renovation is understood to be measures aimed at improving the current functionality of sewage pipes and sewers under full or partial inclusion of their original substance.

The measures used for carrying this out are :

  • Coating processes and
  • Lining processes .
(Image: Damages)
(Image: Distribution of the lining processes)