Domain

Reset domain filter

Show all content types
Images
Animations
Videos
Articles
Technical books
Documentations
Instructions
164 search results found .

Jun 06, 2007

Area of application of the SANWA PRESSTONE and the SANWA HORIZONGER with reference to the particle size distribution and the k-values (k ≤ 10-4 m/s) for a groundwater level up to 6 m above pipe invert [FI-Sanwaa]

Jun 06, 2007

Basic equipment (plan view) for microtunnelling with hydraulic spoil removal with reference to [FI-Hazem] [Image: S&P GmbH]

Jun 16, 2004

Basic equipment, possible arrangement components on the construction site and space requirements (ca. L × B = 35 × 4 m) for microtunnelling with hydraulic spoil removal - plan view (on the model of the jacking of pipes DN/ID 600, pipe length 2.0 m) [Image: visaplan GmbH]

Aug 03, 2005

Construction phases of the trenchless installation of sewers on the model of microtunnelling [Image: S&P GmbH] - Phase 2 (Jacking)

Jun 06, 2007

Conveying of soil with the LUNDBY method for jacking pipes DN/ID 400 [Stein89g] - Special slit grab

Jun 06, 2007

Conveying of soil with the LUNDBY method for jacking pipes DN/ID 400 [Stein89g] - Container for receiving the loosened spoil

Jun 06, 2007

Conveying of soil with the LUNDBY method for jacking pipes DN/ID 400 [Stein89g] - Arrival of a plug of soil pushed to the starting shaft by the scraper

Jun 06, 2007

Conveying of soil with the LUNDBY method for jacking pipes DN/ID 400 [Stein89g] - Slit grab lowered into the starting shaft

Jun 06, 2007

Cutting head design for use in soil and rock - Scraper cutting head with fixed soil entry openings [FI-ICH]

Jun 06, 2007

Cutting head design for use in soil and rock - Rock cutting head with insert roller cutters and small entry openings [FI-MGF]

Jun 06, 2007

Cutting head design for use in soil and rock - Rock cutting head with disc and insert roller cutters [FI-Isekia]

Jun 06, 2007

Cutting head design for use in soil and rock - Rock cutting head with (tungsten carbid) insert roller cutters [FI-Wirthb]

Jul 07, 2006

Cutting head of the steel pipe articulated shield [FI-Dywidd]

Jun 06, 2007

DEINO TYPE [FI-Shin] - View (DN/ID 800)

Jun 06, 2007

DEINO TYPE - Longitudinal section with reference to [FI-Shin] [Image: S&P GmbH]

Jun 06, 2007

Design of the cutting head for the MEPCB shield - Earth pressure equalization at the working face when using a full-face scraper cutting head with adjustable soil entry openings with reference to [ATVA125a] [FI-Isekib] [Image: S&P GmbH]

Jun 06, 2007

Design of the cutting head for the MEPCB shield - Earth pressure equalization at the working face when using a full-face scraper cutting head with adjustable soil entry openings with reference to [ATVA125a] [FI-Isekib] [Image: S&P GmbH]

Jun 06, 2007

Design of the cutting head for the MEPCB shield - Earth pressure equalization at the working face when using a full-face scraper cutting head with adjustable soil entry openings with reference to [ATVA125a] [FI-Isekib] [Image: S&P GmbH]

Jun 06, 2007

Design of the cutting head for the MEPCB shield - View [FI-Isekia]

Jun 06, 2007

Design of the cutting head for the MEPCB shield - Extended and withdrawn cutting head [Stein89g]

Jun 06, 2007

DYWIDAG-Stahlrohrgelenkschild (steel pipe articulated shield) with reference to [FI-Dywidd] [Image: S&P GmbH] - Working process step 2: Installing the pipeline by means of pushing in with simultaneous pushing out the trailing pipe string in the target shaft with the aid of jacking pipes (product pipes) coupled to an adaptor

Jun 06, 2007

DYWIDAG-Stahlrohrgelenkschild (steel pipe articulated shield) [FI-Dywidd] - Trailing pipe with integrated supply and discharge lines

Jun 06, 2007

DYWIDAG-Stahlrohrgelenkschild (steel pipe articulated shield) with reference to [FI-Dywidd] [Image: S&P GmbH] - Working process step 1: Jacking the trailing pipes (DN/OD 860)

Jun 06, 2007

DYWIDAG-Stahlrohrgelenkschild (steel pipe articulated shield) [FI-Dywidd] - Longitudinal section of the microtunnelling machine

Jun 06, 2007

Eccentric cone crusher [FI-MGF]