Domain

Reset domain filter

Show all content types
Images
Animations
Videos
Articles
Technical books
Documentations
Instructions
112 search results found .

Jul 08, 2014

Lena Zemke

Pilot project with CIPP technology of SEKISUI SPR in Shumen, Bulgaria - The challenges often involved in drinking water rehabilitation projects are the available time window, residual flow capacity after the rehabilitation, diameter and length to be renewed. Other factors are the capacity to negotiate bends and local contruction site conditions.

Mar 22, 2006

Adhesive base - applying the thin pulpy adhesive base [Image: S&P GmbH]

Nov 23, 2004

Annular space sealing by the segment method [FI-Plite] - Place sealing chain around the pipe and connect the end links with each other

Mar 22, 2006

Appliying a 15 mm thick contact layer on the concrete pipe wall [Image: S&P GmbH]

Mar 22, 2006

Appliying a 15 mm thick contact layer on the concrete pipe wall [Image: S&P GmbH]