one moment please ...

Presentations

Area Title Author Extent Partner

(Exclusive) Utility Tunnelling - Microtunnelling - Part 2 This presentation is part of the series of presentations "Utility Tunnelling" and deals with microtunnelling.

Prof. Dr.-Ing. Stein & Partner GmbH 68 Slides

Lining with site manufactured and hardened pipes The lecture deals with the application areas and execution of cured-in-place and grouted-in-place process.

Prof. Dr.-Ing. Stein & Partner GmbH 38 Slides

Lining with site manufactured pipes The lecture deals with the method variants and the application areas of lining with spirally-wound pipes.

Prof. Dr.-Ing. Stein & Partner GmbH 21 Slides

Lining with prefabricated pipes without annular space The lecture describes the two different method variants, deformation process and reduction process, as well as their areas and limits of application.

Prof. Dr.-Ing. Stein & Partner GmbH 27 Slides

Lining with prefabricated pipes with annular space The lecture describes the different method variants and systems of lining with prefabricated pipes with annular space especially the lining with continuous and discrete pipes.

Prof. Dr.-Ing. Stein & Partner GmbH 25 Slides

Geotechnical investigations This presentation deals with the fundamentals in geology, hydrogeology and geotechnical engineering.

Prof. Dr.-Ing. Stein & Partner GmbH 31 Slides

Pipe jacking This presentation deals with the fundamentals in pipe jacking.

Prof. Dr.-Ing. Stein & Partner GmbH 38 Slides

Microtunnelling This presentation deals with the different types of microtunnelling.

Prof. Dr.-Ing. Stein & Partner GmbH 35 Slides

Starting and target shafts This presentation deals with the building of starting and target shafts and the design of exit and entry openings.

Prof. Dr.-Ing. Stein & Partner GmbH 48 Slides

Jacking pipes This presentation deals with the different materials of jacking pipes and the corresponding pipe joints.

Prof. Dr.-Ing. Stein & Partner GmbH 45 Slides

Jacking steering, measurement and monitoring This presentation deals with the fundamentals in steering, measurement and monitoring of pipe jacking projects.

Prof. Dr.-Ing. Stein & Partner GmbH 27 Slides

(Exclusive) Utility Tunnelling - Jacking steering, measurement and monitoring This presentation is part of the series of presentations "Utility Tunnelling" and deals with the fundamentals in steering, measurement and monitoring of pipe jacking projects.

Prof. Dr.-Ing. Stein & Partner GmbH 66 Slides

(Exclusive) Utility Tunnelling - Pipe jacking - Part 2 This presentation is part of the series of presentations "Utility Tunnelling" and deals with the various types of shield machines, the removal of obstacles and possible errors in pipe jacking.

Prof. Dr.-Ing. Stein & Partner GmbH 77 Slides

(Exclusive) Utility Tunnelling - Pipe jacking - Part 1 This presentation is part of the series of presentations "Utility Tunnelling" and deals with the fundamentals in pipe jacking.

Prof. Dr.-Ing. Stein & Partner GmbH 79 Slides

(Exclusive) Utility Tunnelling - Microtunnelling - Part 1 This presentation is part of the series of presentations "Utility Tunnelling" and deals with microtunnelling.

Prof. Dr.-Ing. Stein & Partner GmbH 43 Slides

(Exclusive) Utility Tunnelling - Introduction This presentation is part of the series of presentations "Utility Tunnelling" and intends to give an extensive introduction to the topic of trenchless technologies.

Prof. Dr.-Ing. Stein & Partner GmbH 19 Slides

(Exclusive) Damage, its causes and its consequences The aim of this lecture is to provide an overview of the main damage groups, its causes and its consequences.

Prof. Dr.-Ing. Stein & Partner GmbH 46 Slides

(Exclusive) Repair of manholes made of concrete, reinforced concrete and masonry - Part IV - Rehabilitation of cracks in manholes by means of injection This lecture deals with the rehabilitation of cracks in manholes by means of injection.

Prof. Dr.-Ing. Stein & Partner GmbH 28 Slides

(Exclusive) Repair of manholes made of concrete, reinforced concrete and masonry - Part III - Height levelling and replacement of manhole tops This lecture deals with height levelling and replacement of menhole tops.

Prof. Dr.-Ing. Stein & Partner GmbH 42 Slides

D-15 Replacement Lesson: Gallery techniques (heading) - Part III - Limiting conditions This lecture gives an overview of limiting conditions of gallery techniques (heading).

Prof. Dr.-Ing. Stein & Partner GmbH 12 Slides

D-15 Replacement Lesson: Gallery techniques (heading) - Part II - Construction This lecture gives an overview of construction by means of gallery techniques (heading).

Prof. Dr.-Ing. Stein & Partner GmbH 38 Slides

D-15 Replacement Lesson: Gallery techniques (heading) - Part I - Fundamentals This lecture gives an overview of trenchless replacement of pipelines by means of gallery techniques (heading).

Prof. Dr.-Ing. Stein & Partner GmbH 17 Slides

(Exclusive) Trenchless 101 - Part VIII - Horizontal directional drilling This lecture is part of the series "Trenchless 101" and serves to provide an overview of horizontal directional drilling (HDD).

Prof. Dr.-Ing. Stein & Partner GmbH 17 Slides

(Exclusive) Trenchless 101 - Part VII - Steerable new installation This lecture is part of the series "Trenchless 101" and serves to provide an overview of steerable trenchless new installation methods for supply and disposal lines.

Prof. Dr.-Ing. Stein & Partner GmbH 39 Slides

(Exclusive) Repair of manholes made of concrete, reinforced concrete and masonry - Part II - Steps, small defects and joints in masonry manholes This lecture deals with the restoration of steps and small defects as well as the rehabilitstion of joints.

Prof. Dr.-Ing. Stein & Partner GmbH 30 Slides

(Exclusive) Repair of manholes made of concrete, reinforced concrete and masonry - Part I - Fundamentals This lecture presents an overview of the structure and the functions of manholes.

Prof. Dr.-Ing. Stein & Partner GmbH 26 Slides

(Exclusive) Trenchless 101 - Part VI - Non-steerable new installation This lecture is part of the series "Trenchless 101" and serves to provide an overview of non-steerable trenchless new installation methods for supply and disposal lines.

Prof. Dr.-Ing. Stein & Partner GmbH 28 Slides

(Exclusive) Trenchless 101 - Part III - Repair This lecture is part of the series "Trenchless 101" and serves to provide an overview of trenchless repair methods for supply and disposal lines.

Prof. Dr.-Ing. Stein & Partner GmbH 36 Slides

(Exclusive) Trenchless 101 - Part I - Introduction This lecture is part of the series "Trenchless 101" and serves to provide an overview of trenchless methods for the new installation and rehabilitation of supply and disposal lines.

Prof. Dr.-Ing. Stein & Partner GmbH 9 Slides

(Exclusive) Structure and limiting conditions of sewer systems - part III - limiting conditions In this lecture, the limiting conditions like e.g. bedding conditions and sewage ingredients are discussed.

Prof. Dr.-Ing. Stein & Partner GmbH 19 Slides

(Exclusive) Trenchless 101 - Part II - Rehabilitation This lecture is part of the series "Trenchless 101" and serves to provide an overview of rehabilitation for supply and disposal lines.

Prof. Dr.-Ing. Stein & Partner GmbH 23 Slides

(Exclusive) Structure and limiting conditions of sewer systems - part II - pipes and fittings This lecture presents the components and materials needed in drain and sewer systems.

Prof. Dr.-Ing. Stein & Partner GmbH 70 Slides

(Exclusive) Trenchless 101 - Part IV - Renovation This lecture is part of the series "Trenchless 101" and serves to provide an overview of trenchless renovation methods for supply and disposal lines.

Prof. Dr.-Ing. Stein & Partner GmbH 75 Slides

(Exclusive) Trenchless 101 - Part V - Replacement This lecture is part of the series "Trenchless 101" and serves to provide an overview of trenchless replacement methods for supply and disposal lines.

Prof. Dr.-Ing. Stein & Partner GmbH 36 Slides

(Exclusive) Structure and limiting conditions of sewer systems - part I - fundamentals This lecture deals in the main with the specific terminology for sewer systems.

Prof. Dr.-Ing. Stein & Partner GmbH 39 Slides

D-15 Replacement Lesson: Pipe extraction This lecture gives a review of trenchless replacement of pipelines with the pipe extraction.

Prof. Dr.-Ing. Stein & Partner GmbH 42 Slides

(Exclusive) Lining with continuous pipes - Part II - Applied material In this lecture, the fundamentals of the materials applied in the lining processes with continuous pipes are presented and discussed.

Prof. Dr.-Ing. Stein & Partner GmbH 45 Slides

(Exclusive) Lining with continuous pipes - Part V - Branch connections This lecture deals with the branch connection during lining with continuous pipe.

Prof. Dr.-Ing. Stein & Partner GmbH 20 Slides

(Exclusive) Lining with continuous pipes - Part VI - Quality assurance This lecture deals with the quality assurance of lining with continuous pipes with and without annular space.

Prof. Dr.-Ing. Stein & Partner GmbH 17 Slides

(Exclusive) Lining with continuous pipes - Part IV - Method variants without annular space This lecture introduces the method variants of the lining with continuous pipes without annular space.

Prof. Dr.-Ing. Stein & Partner GmbH 40 Slides

(Exclusive) Lining with continuous pipes - Part III - Method variants with annular space This lecture introduces the method variants of the lining with continuous pipes with annular space.

Prof. Dr.-Ing. Stein & Partner GmbH 66 Slides

(Exclusive) Pipe bursting - Part III - Limiting conditions The 3rd part of the series of lectures about pipe bursting gives a review of the boundary conditions.

Prof. Dr.-Ing. Stein & Partner GmbH 81 Slides

D-15 Replacement Lesson: The welding of plastic pipes This lecture deals with the welding of polyethylene, putting the main focus on heating element butt welding, which is mainly applied in lining processes with continuous pipes.

Prof. Dr.-Ing. Stein & Partner GmbH 87 Slides

(Exclusive) Pipe bursting - Part II - Types of method The 2nd part of the series of lectures about pipe bursting gives a review of the individual method types.

Prof. Dr.-Ing. Stein & Partner GmbH 30 Slides

(Exclusive) Pipe bursting - Part I - Basics This lecture gives a review of trenchless replacement of pipelines with the pipe bursting.

Prof. Dr.-Ing. Stein & Partner GmbH 35 Slides

(Exclusive) Lining with continuous pipes - Part I - Fundamentals This lecture deals with the basic principles of lining with continuous pipes processes as well as their terminological definitions, limiting conditions and areas of application.

Prof. Dr.-Ing. Stein & Partner GmbH 26 Slides

(Exclusive) Lining with cured-in-place pipes - Part III This lecture deals with the cured-in-place lining processes for the rehabilitation of sewers and private domain sewers. The third part of the lecture gives information about quality assurance.

Prof. Dr.-Ing. Stein & Partner GmbH 36 Slides

(Exclusive) Lining with cured-in-place pipes - Part II This lecture deals with the cured-in-place lining processes for the rehabilitation of sewers and private domain sewers. The second part deals with the execution of this process.

Prof. Dr.-Ing. Stein & Partner GmbH 62 Slides

(Exclusive) Overview of inspection methods - Part II Part 2 of the lecture describes the methods of indirect optical inspection and also deals with the latest developments and trends in this respect.

Prof. Dr.-Ing. Stein & Partner GmbH 44 Slides

(Exclusive) Overview of inspection methods - Part I The first part of this lecture provides an overview of the environmentally relevant, hydraulic and structural investigations as part of inspection.The indirect optical inspection is excluded here as it is discussed in part 2.

Prof. Dr.-Ing. Stein & Partner GmbH 35 Slides

(Exclusive) Lining with cured-in-place pipes - Part I This lecture deals with the cured-in-place lining processes for the rehabilitation of sewers and private domain sewers, and here especially with limiting conditions, areas of application and material components.

Prof. Dr.-Ing. Stein & Partner GmbH 32 Slides

Mathematical Simulation of Pipe Stresses for Difficult Jackings The presentation shows the new calculation program "Co-Jack" (Computing and Controlling Pipe Jacking) for a structural simulation of pipe jackings.

Prof. Dr.-Ing. Stein & Partner GmbH 52 Slides

(Exclusive) Utility Tunnelling - Starting and target shafts This presentation is part of the series of presentations "Utility Tunnelling" and deals with the building of starting and target shafts and the design of exit and entry openings.

Prof. Dr.-Ing. Stein & Partner GmbH 108 Slides

(Exclusive) Utility Tunnelling - Geotechnical investigations This presentation is part of the series of presentations "Utility Tunnelling" and deals with the fundamentals in geology, hydrogeology and geotechnical engineering.

Prof. Dr.-Ing. Stein & Partner GmbH 120 Slides

(Exclusive) Utility Tunnelling - Jacking pipes This presentation is part of the series of presentations "Utility Tunnelling" and deals with the different materials of jacking pipes and the corresponding pipe joints.

Prof. Dr.-Ing. Stein & Partner GmbH 103 Slides

D-05 Cleaning 1 Lesson: Cleaning vehicles

81 Slides

D-05 Cleaning I Lesson: Solids in sewers

54 Slides

D-05 Cleaning I Lesson: Strategy

92 Slides

D-05 Cleaning I Lesson: Nozzles

111 Slides

D-06 Cleaning II Lesson: Cleaning of pressure lines

11 Slides

D-06 Cleaning II Lesson: Flushing methods

103 Slides

D-06 Cleaning II Lesson: Cleaning of large profiles

22 Slides

D-06 Cleaning II Lesson: Mechanical cleaning methods

44 Slides

D-02 Open cut method Lesson 01: Geotechnical and Hydrogeological principles Diese Lektion ist unter anderem Bestandteil des Moduls "Verlegung in offener Bauweise" und beschäftigt sich mit den bodenmechanischen und hydrogeologischen Grundlagen zur Charakterisierung des Baugrundes.

Prof. Dr.-Ing. Stein & Partner GmbH 83 Slides

D-02 Open cut method Lesson 03: Embedment and installation of piping Diese Lektion ist unter anderem Teil des Moduls "Verlegung in offener Bauweise" und beschäftigt sich mit den Themenbereichen Grabenbreite, Grabensohle, Verlegung von Rohren und Grabenverfüllung.

Prof. Dr.-Ing. Stein & Partner GmbH 107 Slides

D-02 Open cut method Lesson 04: Occupational health and safety Diese Lektion ist unter anderem Teil des Moduls "Verlegung in offener Bauweise" und beschäftigt sich mit dem Thema der Arbeitssicherheit.

Prof. Dr.-Ing. Stein & Partner GmbH 35 Slides

D-02 Open cut method Lesson 02: Utility Trench Construction Diese Lektion ist unter anderem Teil des Moduls "Verlegung in offener Bauweise" und beschäftigt sich mit der Planung und Herstellung des Leitungsgrabens sowie mit den Anforderungen an die dabei einzusetzenden Bauteile und Baustoffe.

Prof. Dr.-Ing. Stein & Partner GmbH 88 Slides

D-15 Replacement Lesson: Pipe Bursting Diese Lektion ist unter anderem Teil des Moduls "Erneuerung in geschlossener Bauweise" und beschäftigt sich mit weiterführenden Details des Berstverfahrens. Neben den Anforderungen an Werkstoffe und Gerätschaften werden vor allem die auftretenden Bodenbewegungen behandelt.

Prof. Dr.-Ing. Stein & Partner GmbH 69 Slides

D-15 Replacement Lesson: Pipe Bursting Basics Diese Lektion ist unter anderem Teil des Moduls "Erneuerung in geschlossener Bauweise" und beschäftigt sich mit den Grundlagen des Berstverfahrens. Neben der Prozessbeschreibung werden die Einsatzbereiche, -grenzen und das Thema Qualitätssicherung behandelt.

Prof. Dr.-Ing. Stein & Partner GmbH 54 Slides

D-15 Replacement Lesson: Pipe Pullback Diese Lektion ist unter anderem Teil des Moduls "Erneuerung in geschlossener Bauweise" und beschäftigt sich mit der Beschreibung des Einziehvorgangs und mit den in diesem Kontext zu berücksichtigenden Parametern.

Prof. Dr.-Ing. Stein & Partner GmbH 35 Slides

D-01 Wastewater collection systems Lesson: The Hydrologic Cycle

10 Slides

D-01 Wastewater collection systems Lesson: Histrorical development of wastewater collections systems

8 Slides

D-01 Wastewater collection systems Lesson: Fundamentals of sewer drainage systems

63 Slides

D-01 Wastewater collection systems Lesson: Sewers

132 Slides

D-01 Wastewater collection systems Lesson: Manholes

102 Slides

D-02 (US) Open cut method Lesson: Geotechnical and Hydrogeological principles This lesson is amoung others part of the module (US version) "Installation of water pipes, drains and sewers using the open cut method" and deals with the geotechnical and hydrogeological principles for the characterization of soils.

Prof. Dr.-Ing. Stein & Partner GmbH 88 Slides

D-02 (US) Open cut method Lesson: Utility Trench Construction This lesson is amoung others part of the module (US version) "Installation of water pipes, drains and sewers using the open cut method" and deals with the planning and creation of the trench as well as with the requirements for the components and construction materials to be used.

Prof. Dr.-Ing. Stein & Partner GmbH 101 Slides

D-02 (US) Open cut method Lesson: Embedment of Piping This lesson is amoung others part of the module (US version) "Installation of water pipes, drains and sewers using the open cut method" and deals with topics of embedment, trench width and trenching.

Prof. Dr.-Ing. Stein & Partner GmbH 100 Slides

D-02 (US) Open cut method Lesson: Occupational health and safety This lesson is amoung others part of the module (US version) "Installation of water pipes, drains and sewers using the open cut method" and deals with occupational health and safety.

Prof. Dr.-Ing. Stein & Partner GmbH 48 Slides

C-08 (US) Replacement Lesson: Pipe Bursting Basics This lesson is, among other things, part of the module (US version) "Replacement of Water, Wastewater and Gaspipelines" and deals with the basics of the bursting process. In addition to the process description, the areas of application and limits and the topic of quality assurance are dealt with.

Prof. Dr.-Ing. Stein & Partner GmbH in cooperation with Trenchless Technology Center 54 Slides

C-08 (US) Replacement Lesson: Pipe Bursting This lesson is, among other things, part of the module (US version) "Replacement of Water, Wastewater and Gaspipelines" and deals with further details of the bursting process. In addition to the requirements for materials and equipment, the ground movements are mainly treated.

Prof. Dr.-Ing. Stein & Partner GmbH in cooperation with Trenchless Technology Center 69 Slides

C-08 (US) Replacement Lesson: Pipe Pullback This lesson is, among other things, part of the module (US version) "Replacement of Water, Wastewater and Gaspipelines" and deals with the description of the insertion and pullback of the pipeline and the parameters to be considered in this context.

Prof. Dr.-Ing. Stein & Partner GmbH in cooperation with Trenchless Technology Center 35 Slides

C-08 (US) Replacement Lesson: The welding of plastic pipes This lesson is, among other things, part of the module (US version) "Replacement of Water, Wastewater and Gaspipelines" and deals withthe welding of polyethylene, putting the main focus on heating element butt welding, which is mainly applied in lining processes with continuous pipes.

Prof. Dr.-Ing. Stein & Partner GmbH in cooperation with Trenchless Technology Center 92 Slides

C-08 (US) Replacement Lesson: Gallery techniques (heading) - Part I - Fundamentals This lesson is, among other things, part of the module (US version) "Replacement of Water, Wastewater and Gaspipelines" and gives an overview of trenchless replacement of pipelines by means of gallery techniques (heading).

Prof. Dr.-Ing. Stein & Partner GmbH in cooperation with Trenchless Technology Center 17 Slides

C-08 (US) Replacement Lesson: Gallery techniques (heading) - Part II - Construction This lesson is, among other things, part of the module (US version) "Replacement of Water, Wastewater and Gaspipelines" and gives an overview of construction by means of gallery techniques (heading).

Prof. Dr.-Ing. Stein & Partner GmbH in cooperation with Trenchless Technology Center 38 Slides

C-08 (US) Replacement Lesson: Gallery techniques (heading) - Part III - Limiting conditions This lesson is, among other things, part of the module (US version) "Replacement of Water, Wastewater and Gaspipelines" and gives an overview of limiting conditions of gallery techniques (heading).

Prof. Dr.-Ing. Stein & Partner GmbH in cooperation with Trenchless Technology Center 13 Slides

C-08 (US) Replacement Lesson: Pipe Extraction This lesson is, among other things, part of the module (US version) "Replacement of Water, Wastewater and Gaspipelines" and gives a review of trenchless replacement of pipelines with the pipe extraction.

Prof. Dr.-Ing. Stein & Partner GmbH in cooperation with Trenchless Technology Center 42 Slides

D-02 (US) Open cut method Lesson: Installation of Pipes This lesson is amoung others part of the module (US version) "Installation of water pipes, drains and sewers using the open cut method" and deals with topics the installation of piping.

Prof. Dr.-Ing. Stein & Partner GmbH 77 Slides
one moment please ...
one moment please ...